海口世纪大桥主塔沉井,下沉深度达36m,施工处于台风频发区。介绍沉井钢壳整体制作吊装、滑模接高钢筋混凝土井体、钻吸法破土吸泥、泥浆套助沉、信息监控等施工技术。
海口世紀大橋主塔沉井,下沉深度達36m,施工處于檯風頻髮區。介紹沉井鋼殼整體製作弔裝、滑模接高鋼觔混凝土井體、鑽吸法破土吸泥、泥漿套助沉、信息鑑控等施工技術。
해구세기대교주탑침정,하침심도체36m,시공처우태풍빈발구。개소침정강각정체제작조장、활모접고강근혼응토정체、찬흡법파토흡니、니장투조침、신식감공등시공기술。
With a sunk depth of 36m, the sunk well for the main tower ofHaikou Century Bridge is constructed at the area where typhoon occurs frequently. The construction technology of integral manufacture and erection of steel casing, heightening by sliding formwork, sucking soil by drilling & sucking method, assisting sinking by slurry, as well as information monitoring, etc. are introduced.