采用厌氧膨化床(AEBR)+快速渗滤土地处理系统(CRI)处理小城镇污水,装置启动后,厌氧膨胀床和土地快速渗滤系统的容积负荷分别为0.71 kgCOD/(m3.d)和0.012 kgCOD/(m3.d);AEBR的水力停留时间为4.5 h,回流比为400%;CRI的水力负荷为0.02 m3/(m2.d),湿干周期比约为1∶6。系统在稳定运行期对COD、总氮、氨氮、总磷的平均去除率分别达到83%、85%、87%、79%,达到《城镇污水处理厂污染物排放标准》(GB18918-2002)规定的一级标准。AEBR+CRI处理城镇污水的污泥产率低,约为0.04 kgVSS/kgCOD。
採用厭氧膨化床(AEBR)+快速滲濾土地處理繫統(CRI)處理小城鎮汙水,裝置啟動後,厭氧膨脹床和土地快速滲濾繫統的容積負荷分彆為0.71 kgCOD/(m3.d)和0.012 kgCOD/(m3.d);AEBR的水力停留時間為4.5 h,迴流比為400%;CRI的水力負荷為0.02 m3/(m2.d),濕榦週期比約為1∶6。繫統在穩定運行期對COD、總氮、氨氮、總燐的平均去除率分彆達到83%、85%、87%、79%,達到《城鎮汙水處理廠汙染物排放標準》(GB18918-2002)規定的一級標準。AEBR+CRI處理城鎮汙水的汙泥產率低,約為0.04 kgVSS/kgCOD。
채용염양팽화상(AEBR)+쾌속삼려토지처리계통(CRI)처리소성진오수,장치계동후,염양팽창상화토지쾌속삼려계통적용적부하분별위0.71 kgCOD/(m3.d)화0.012 kgCOD/(m3.d);AEBR적수력정류시간위4.5 h,회류비위400%;CRI적수력부하위0.02 m3/(m2.d),습간주기비약위1∶6。계통재은정운행기대COD、총담、안담、총린적평균거제솔분별체도83%、85%、87%、79%,체도《성진오수처리엄오염물배방표준》(GB18918-2002)규정적일급표준。AEBR+CRI처리성진오수적오니산솔저,약위0.04 kgVSS/kgCOD。
In this study,the combined process of Anaerobic Expanded Blanket Reactor(AEBR) and Constructed Rapid Infiltration System(CRI) was used to treat the domestic sewage from the small towns.After the start-up,the volume load of AEBR and CRI was 0.71 kgCOD/(m3·d) and 0.012 kgCOD/(m3·d) respectively.The hydraulic retention time(HRT) in AEBR was 4.5 hours,and the reflux ratio of it was 400%.The hydraulic loading of CRI was 0.02 m3/(m2·d),and the wet/dry ratio of it was 1∶6.During the stable operation,the removal efficiency of COD,T-N,NH3-N was 83%,85%,87% and 79% respectively,the effluent concentration achieving the first standard in "Cities Sewage treatment plant Pollutant discharge Standard"(GB18918-2002).The sludge yield by this system was low,about 0.04 kgVSS/kgCOD.