软起动器%10kV电机%故障分析%短接柜
軟起動器%10kV電機%故障分析%短接櫃
연기동기%10kV전궤%고장분석%단접거
Soft-starter%10kV motor%malfunction analyze%shorting cabinet
10kV电机起动后,当电流下降至1.5倍额定电流及综保设定时间满足(如40s),短接柜切除热变电阻软起动器,此时电机投全压,起动过程结束。本文扼要介绍其工作原理,并对两起起动失败案例进行分析与探讨。
10kV電機起動後,噹電流下降至1.5倍額定電流及綜保設定時間滿足(如40s),短接櫃切除熱變電阻軟起動器,此時電機投全壓,起動過程結束。本文扼要介紹其工作原理,併對兩起起動失敗案例進行分析與探討。
10kV전궤기동후,당전류하강지1.5배액정전류급종보설정시간만족(여40s),단접거절제열변전조연기동기,차시전궤투전압,기동과정결속。본문액요개소기공작원리,병대량기기동실패안례진행분석여탐토。
After 10kV motor starts,its current decreases to 1.5Ie(Ie: rated current),and the set time arrives(I.E.40second),shorting cabinet cuts our HTR(high voltage temperature resistor soft starter),the motor gets the full voltage.Then the starting is the end.This paper introduces its working principle simply,and analyzes,discuss the two failure starts.