跳仓法%超长地下混凝土%应力释放%温度应力%MIDAS
跳倉法%超長地下混凝土%應力釋放%溫度應力%MIDAS
도창법%초장지하혼응토%응력석방%온도응력%MIDAS
sequence method%super long underground concrete%stress release%temperature stress%MIDAS
结合具体工程实例,介绍了超长地下混凝土结构"跳仓法"施工工艺,通过有限元对比分析表明:工程中所采用的"跳仓法"施工工艺较为有效,在以后相关工程运用中,可以利用有限元分析计算工程模拟来进行指导及预测.
結閤具體工程實例,介紹瞭超長地下混凝土結構"跳倉法"施工工藝,通過有限元對比分析錶明:工程中所採用的"跳倉法"施工工藝較為有效,在以後相關工程運用中,可以利用有限元分析計算工程模擬來進行指導及預測.
결합구체공정실례,개소료초장지하혼응토결구"도창법"시공공예,통과유한원대비분석표명:공정중소채용적"도창법"시공공예교위유효,재이후상관공정운용중,가이이용유한원분석계산공정모의래진행지도급예측.
Combined with specific engineering example, the sequence method construction process in super long underground concrete structure was introduced. The finite dement compassion analysis indicated that the sequence method construction process adopted in engineering was ef-fective, and it can be guided and prospected by engineering simulation with finite element analysis.