测量%控制网布设“%折叠”线形锁
測量%控製網佈設“%摺疊”線形鎖
측량%공제망포설“%절첩”선형쇄
survey%layout of control network%folded linear triangulation chains
柏叶口水库坝底地处文峪河谷河段,地形条件复杂,河谷高差较大。文中论述了该水库坝址测量控制网布设的原则和具体方法。通过采用"折叠线形锁"控制网的办法解决了施测过程中的困难,取得了很好的效果。
柏葉口水庫壩底地處文峪河穀河段,地形條件複雜,河穀高差較大。文中論述瞭該水庫壩阯測量控製網佈設的原則和具體方法。通過採用"摺疊線形鎖"控製網的辦法解決瞭施測過程中的睏難,取得瞭很好的效果。
백협구수고패저지처문욕하곡하단,지형조건복잡,하곡고차교대。문중논술료해수고패지측량공제망포설적원칙화구체방법。통과채용"절첩선형쇄"공제망적판법해결료시측과정중적곤난,취득료흔호적효과。
The dam site of Baiyekou Reservoir is located in a narrow gorge of Wenyu River reach.Its topography condition is complex and the elevation difference of river valley is obvious.In this paper,the layout principle of control network to survey topography of this dam site and concrete survey method are introduced.By means of the folded linear triangulation chains network methed,the difficult problems that are encountered is survey process are solved,and the good effect is obtained.