为适应智能电网的建设需要,对非综合自动化变电站建设建议全部改造成IEC61850规约变电站.变电站自动化系统只在站控层和间隔层实现基于IEC61850标准的系统;监控装置、远动装置、继保子站、测控装置、电压切换装置和低压裳置全部按新建变电站配置.自动化系统的站控层采用双以太网,采用IEC61850规约;保护通信予站采用单以太网,IEC61850规约;低压保护设备、测控装置、新上高/中压保护设备采用IEC61850规约,通过双网将数据上送监控装置.未改造的采用RS-485或以太网103通信的保护设备,由各制造厂家负责升级改造.根据目前非综自站的现状,指出应考虑改造顺序、网络设备、增加交/直流馈线柜等方面问题.
為適應智能電網的建設需要,對非綜閤自動化變電站建設建議全部改造成IEC61850規約變電站.變電站自動化繫統隻在站控層和間隔層實現基于IEC61850標準的繫統;鑑控裝置、遠動裝置、繼保子站、測控裝置、電壓切換裝置和低壓裳置全部按新建變電站配置.自動化繫統的站控層採用雙以太網,採用IEC61850規約;保護通信予站採用單以太網,IEC61850規約;低壓保護設備、測控裝置、新上高/中壓保護設備採用IEC61850規約,通過雙網將數據上送鑑控裝置.未改造的採用RS-485或以太網103通信的保護設備,由各製造廠傢負責升級改造.根據目前非綜自站的現狀,指齣應攷慮改造順序、網絡設備、增加交/直流饋線櫃等方麵問題.
위괄응지능전망적건설수요,대비종합자동화변전참건설건의전부개조성IEC61850규약변전참.변전참자동화계통지재참공층화간격층실현기우IEC61850표준적계통;감공장치、원동장치、계보자참、측공장치、전압절환장치화저압상치전부안신건변전참배치.자동화계통적참공층채용쌍이태망,채용IEC61850규약;보호통신여참채용단이태망,IEC61850규약;저압보호설비、측공장치、신상고/중압보호설비채용IEC61850규약,통과쌍망장수거상송감공장치.미개조적채용RS-485혹이태망103통신적보호설비,유각제조엄가부책승급개조.근거목전비종자참적현상,지출응고필개조순서、망락설비、증가교/직류궤선거등방면문제.
It is suggested to retrofit the non-integrated automation substation based on IEC61850 to meet the needs of smart grid construction. Only the station level and bay level of substation automation system adopt IEC6185O standard and the devices of monitoring,remote control,protective substation,measuring & control,bus-switchover and low-voltage protection are configured as new substation. The station level applies dual Ethernet based on IEC61850 protocol; the protection substation applies single Ethernet based on IEC61850 protocol; the low-voltage protection, measuring & control device, newly-configured high /medium -voltage protection sends data to monitoring devices via dual net based on IEC61850 protocol;the reserved protective equipments applying RS-485 or Ethernet 103 communication are upgraded by the manufacturers. According to the current status of non-integrated automation substations, it is pointed out that the retrofitting sequence, network equipment, increased AC/DC feeder cabinets and so on should be taken into account.