本文针对调剖、酸化技术对剖面改善作用相对单一,效果受作用机理和地层层间渗透率差异等因素的限制,且调剖、酸化施工过程中,堵剂、酸液可能进入非目的层,导致低渗透层被堵剂污染或高渗透层被酸液解堵,以致吸水剖面进一步变差的现状,提出了封堵与酸化结合改善注水井吸水剖面新工艺,利用调剖-酸化两种工艺的协同作用,最大限度地缩小层间渗透率级差,提高吸水剖面的均匀程度和水驱动用效果的工艺技术.通过室内评价,筛选出了适合不同渗透率地层封堵需要的强堵、弱堵、暂堵三类堵剂和针对不同污染的地层复合解堵酸体系,并优化出了一套相应的选井原则和施工工艺.2001年至2002年底,现场实施46井次,可对比吸水剖面13口井,平均单井吸水厚度增加3.4m/1.4层.累计增油10519吨,投入产出比l:3.5.
本文針對調剖、痠化技術對剖麵改善作用相對單一,效果受作用機理和地層層間滲透率差異等因素的限製,且調剖、痠化施工過程中,堵劑、痠液可能進入非目的層,導緻低滲透層被堵劑汙染或高滲透層被痠液解堵,以緻吸水剖麵進一步變差的現狀,提齣瞭封堵與痠化結閤改善註水井吸水剖麵新工藝,利用調剖-痠化兩種工藝的協同作用,最大限度地縮小層間滲透率級差,提高吸水剖麵的均勻程度和水驅動用效果的工藝技術.通過室內評價,篩選齣瞭適閤不同滲透率地層封堵需要的彊堵、弱堵、暫堵三類堵劑和針對不同汙染的地層複閤解堵痠體繫,併優化齣瞭一套相應的選井原則和施工工藝.2001年至2002年底,現場實施46井次,可對比吸水剖麵13口井,平均單井吸水厚度增加3.4m/1.4層.纍計增油10519噸,投入產齣比l:3.5.
본문침대조부、산화기술대부면개선작용상대단일,효과수작용궤리화지층층간삼투솔차이등인소적한제,차조부、산화시공과정중,도제、산액가능진입비목적층,도치저삼투층피도제오염혹고삼투층피산액해도,이치흡수부면진일보변차적현상,제출료봉도여산화결합개선주수정흡수부면신공예,이용조부-산화량충공예적협동작용,최대한도지축소층간삼투솔급차,제고흡수부면적균균정도화수구동용효과적공예기술.통과실내평개,사선출료괄합불동삼투솔지층봉도수요적강도、약도、잠도삼류도제화침대불동오염적지층복합해도산체계,병우화출료일투상응적선정원칙화시공공예.2001년지2002년저,현장실시46정차,가대비흡수부면13구정,평균단정흡수후도증가3.4m/1.4층.루계증유10519둔,투입산출비l:3.5.
Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low and medium permeability zones and the penetration radius of acid into high permeability zones. The procedure is: First inject plugging agent to block high permeability zones, and then inject acid to remove plugging agent damage from the low and medium permeability zones and stimulate them. To perform this procedure successfully, three kinds of plugging agents, namely strong strength plugging agent for the wells with fractures or high permeability streaks, weak gel for those with thick layer in which serious heterogeneity exists, temporary plugging agent for those in which the absorption ability of high permeability zones needs maintaining, were screened out for use in different reservoirs. Several acid systems were evaluated to be compatible with the three kinds of plugging agents. The objectives of this paper are: ( 1 ) To show the screen results about the compatible plugging agent and acid;(2) To show how to optimize the operation process;(3) To tell some experience gained from the oilfield applications of this technique. From Jan. 2001 to Dec. 2002, 46 operations using this procedure were carried out in Weicheng and Mazhai Oilfields of SINOPEC. Results show that the average benefit/cost ratio is over 3.5. Experience acquired from these applications was summarized in the paper.