上冠%吊具%吊装%水轮机
上冠%弔具%弔裝%水輪機
상관%조구%조장%수륜궤
Crown%Slings for Lifting Loads%Hoisting%Turbine
本文主要针对700MW级水轮机转轮铸钢件上冠生产过程中吊转运问题,通过公司生产制造三峡、向家坝、溪洛渡等700MW级水轮机上冠铸钢件精加工后吊转运用钢丝绳捆绑工件或焊接吊把起吊,制作胎具简化起吊难度。
本文主要針對700MW級水輪機轉輪鑄鋼件上冠生產過程中弔轉運問題,通過公司生產製造三峽、嚮傢壩、溪洛渡等700MW級水輪機上冠鑄鋼件精加工後弔轉運用鋼絲繩捆綁工件或銲接弔把起弔,製作胎具簡化起弔難度。
본문주요침대700MW급수륜궤전륜주강건상관생산과정중조전운문제,통과공사생산제조삼협、향가패、계락도등700MW급수륜궤상관주강건정가공후조전운용강사승곤방공건혹한접조파기조,제작태구간화기조난도。
Aiming at the problem of lifting loads and hoisting during the manufacture of runner crown of 700MW hydro turbine, we bind on the parts with steel wire or hoisting with welded lugs during the manufacture of hydro runner crowns by the company, which is after final machining for the Three Gorges, Xiangjiaba, Xiluodu, and make models to simplify the hoisting.