杭州市四堡污水处理厂采用A/O工艺,经检测发现其曝气池溶解氧浓度较低,不能满足处理要求.2008年2月对其曝气系统进行改造,改造后曝气池溶解氧较改造前有了较大提高,各污染物去除效率也有所改善.介绍了工程改造的具体内容,并对改造工程进行了经济效益分析.
杭州市四堡汙水處理廠採用A/O工藝,經檢測髮現其曝氣池溶解氧濃度較低,不能滿足處理要求.2008年2月對其曝氣繫統進行改造,改造後曝氣池溶解氧較改造前有瞭較大提高,各汙染物去除效率也有所改善.介紹瞭工程改造的具體內容,併對改造工程進行瞭經濟效益分析.
항주시사보오수처리엄채용A/O공예,경검측발현기폭기지용해양농도교저,불능만족처리요구.2008년2월대기폭기계통진행개조,개조후폭기지용해양교개조전유료교대제고,각오염물거제효솔야유소개선.개소료공정개조적구체내용,병대개조공정진행료경제효익분석.
The A/O process was employed in Sibao Wastewater Treatment Plant in Hangzhou City. The dissolved oxygen content was measured to be low, which could not satisfy the need of treatment. The reconstruction of its aeration system was carried out in February 2008. After the reconstruction, the dissolved oxygen content in aeration tank was increased greatly and the pollutants removal efficiency was also improved. The specific information of the reconstruction project was introduced and the economic analysis of the reconstruction project was also carried out.