2009-07-31,四川省凉山彝族自治州西溪河流域金阳县地洛电站施工区暴发泥石流,造成9人死亡、施工道路及设施损毁.通过现场调查和分析认为,"7.31"泥石流是一场高容重低粘度坡面型泥石质泥石流,强降雨是此次泥石流形成的激发条件,工程弃渣是其形成的物质基础和条件,过沟公路未合理设置排水涵洞,路基被毁,沿途大量物质补给是泥石流形成的促进因素."7.31"泥石流隐蔽性强,人们对其危害范围认识不足,防灾意识薄弱,监测预警不到位,是造成人员伤亡与财产损失的重要因素.结合西溪河流域水电开发的现状,针对性地提出了规范人类工程活动,提高防灾意识,加强地质灾害的监测预警等防治对策,建议进一步加强中小水电工程施工的监管力度,切实落实灾害危险性评估与防灾措施,最大限度地减少人为地质灾害.
2009-07-31,四川省涼山彝族自治州西溪河流域金暘縣地洛電站施工區暴髮泥石流,造成9人死亡、施工道路及設施損燬.通過現場調查和分析認為,"7.31"泥石流是一場高容重低粘度坡麵型泥石質泥石流,彊降雨是此次泥石流形成的激髮條件,工程棄渣是其形成的物質基礎和條件,過溝公路未閤理設置排水涵洞,路基被燬,沿途大量物質補給是泥石流形成的促進因素."7.31"泥石流隱蔽性彊,人們對其危害範圍認識不足,防災意識薄弱,鑑測預警不到位,是造成人員傷亡與財產損失的重要因素.結閤西溪河流域水電開髮的現狀,針對性地提齣瞭規範人類工程活動,提高防災意識,加彊地質災害的鑑測預警等防治對策,建議進一步加彊中小水電工程施工的鑑管力度,切實落實災害危險性評估與防災措施,最大限度地減少人為地質災害.
2009-07-31,사천성량산이족자치주서계하류역금양현지락전참시공구폭발니석류,조성9인사망、시공도로급설시손훼.통과현장조사화분석인위,"7.31"니석류시일장고용중저점도파면형니석질니석류,강강우시차차니석류형성적격발조건,공정기사시기형성적물질기출화조건,과구공로미합리설치배수함동,로기피훼,연도대량물질보급시니석류형성적촉진인소."7.31"니석류은폐성강,인문대기위해범위인식불족,방재의식박약,감측예경불도위,시조성인원상망여재산손실적중요인소.결합서계하류역수전개발적현상,침대성지제출료규범인류공정활동,제고방재의식,가강지질재해적감측예경등방치대책,건의진일보가강중소수전공정시공적감관력도,절실락실재해위험성평고여방재조시,최대한도지감소인위지질재해.
July 31st,2009,a disastrous debris flow occurred at Diluo Water-Power Construction Areas in Xixi River basin,Sichuan province. Debris flow resulted in 9 persons dead, highway broken and many facilities damaged. It was demonstrated on the basis of field investigation that "7.31" debris flow hazard was a typical slope debris flow with high density and low viscosity, which developed and formed at the construction wastes area,and was triggered by intensive rainfall and exacerbated by virtue of the absence of culverts at where highways spanned gullies so that the roadbeds was broke. It was also proved that the personal casualty and properties loss were mainly caused by the concealment of this debris flow,the mistiness to hazard range and the ignorance to hazard prevention consciousness of local people as well as the absence of alarm measures. Then it was strongly suggested that sticky run construction activities, enhanced hazard prevention consciousness of debris flow, reinforced the monitor and alarm of geo-hazards as well as further supervised the construction activities of small middle scale water-power station in order to mitigate hazard loss as soon as possible.