石油勘探与开发
石油勘探與開髮
석유감탐여개발
PETROLEUM EXPLORATION AND DEVELOPMENT
2010年
2期
220-225
,共6页
张伟%林承焰%周明晖%王贺林
張偉%林承燄%週明暉%王賀林
장위%림승염%주명휘%왕하림
岩性构造油藏%地质建模%随钻测井%地质模型更新%多步建模%水平井%关家堡油田
巖性構造油藏%地質建模%隨鑽測井%地質模型更新%多步建模%水平井%關傢堡油田
암성구조유장%지질건모%수찬측정%지질모형경신%다보건모%수평정%관가보유전
litho-structural reservoir%geological modeling%logging-while-drilling%geological model updating%multistage modeling%horizontal well%Guanjiapu Oilfield
地质模型动态更新依据随钻测井资料及时更新先期建立的地质模型,得到钻井不同时刻的三维地质模型,实时有效地了解储集层空间展布,及时发现其构造、产状等的变化,从而对原有设计井眼轨迹加以修正,有效地调整钻井前进轨迹,发挥地质导向作用,直至以最佳方式穿过油层,最终达到提高水平段有效率和钻井总体效益的目的.把地质模型动态更新方法应用于关家堡油田水平井钻井过程中,结合测井、地质和地震等资料,并把随钻资料加入到地质模型中,采用多步建模的方法进行地质条件约束,更新并完善GR、孔隙度、渗透率等模型,提高了储集层随机建模精度,特别是砂体分布模型的精度,保证了模型的准确性和可靠性.Zh8一H井钻井实践表明,由于及时地提供了较为准确的地质模型,明显地提高了水平井钻遇油层的能力.
地質模型動態更新依據隨鑽測井資料及時更新先期建立的地質模型,得到鑽井不同時刻的三維地質模型,實時有效地瞭解儲集層空間展佈,及時髮現其構造、產狀等的變化,從而對原有設計井眼軌跡加以脩正,有效地調整鑽井前進軌跡,髮揮地質導嚮作用,直至以最佳方式穿過油層,最終達到提高水平段有效率和鑽井總體效益的目的.把地質模型動態更新方法應用于關傢堡油田水平井鑽井過程中,結閤測井、地質和地震等資料,併把隨鑽資料加入到地質模型中,採用多步建模的方法進行地質條件約束,更新併完善GR、孔隙度、滲透率等模型,提高瞭儲集層隨機建模精度,特彆是砂體分佈模型的精度,保證瞭模型的準確性和可靠性.Zh8一H井鑽井實踐錶明,由于及時地提供瞭較為準確的地質模型,明顯地提高瞭水平井鑽遇油層的能力.
지질모형동태경신의거수찬측정자료급시경신선기건립적지질모형,득도찬정불동시각적삼유지질모형,실시유효지료해저집층공간전포,급시발현기구조、산상등적변화,종이대원유설계정안궤적가이수정,유효지조정찬정전진궤적,발휘지질도향작용,직지이최가방식천과유층,최종체도제고수평단유효솔화찬정총체효익적목적.파지질모형동태경신방법응용우관가보유전수평정찬정과정중,결합측정、지질화지진등자료,병파수찬자료가입도지질모형중,채용다보건모적방법진행지질조건약속,경신병완선GR、공극도、삼투솔등모형,제고료저집층수궤건모정도,특별시사체분포모형적정도,보증료모형적준학성화가고성.Zh8일H정찬정실천표명,유우급시지제공료교위준학적지질모형,명현지제고료수평정찬우유층적능력.
Through building 3D geological models in different drilling time according to the logging while drilling(LWD) data and by updating the previous geological models, the dynamic updating of geological model could enable the acquisition of the spatial distribution of reservoir effectively and find the structural and occurrence changes instantly, so as to modify the former designed borehole track and adjust the drilling track by geosteering, and drill the oil layers in the best way. It can improve the effectiveness of horizontal interval and the drilling benefit. Combined with well logging, geological data and seismic data as well as the LWD data, this method was applied to the drilling of the Guanjiapu Oilfield, and the geological conditions were constrained by the multistage modeling method, to update and improve the GR, porosity and permeability models and the accuracy of reservoir random models, especially the sandstone distribution model to ensure the accuracy and reliability of the model. The drilling of Well Zh8-H has shown that the geosteering drilling capability was obviously improved in light of providing accurate geological model timely.