TECHNIQUE OF SEEPAGE CONTROL
2011年
6期
126-128
,共3页
隧洞%地质%全断面岩石掘进机
隧洞%地質%全斷麵巖石掘進機
수동%지질%전단면암석굴진궤
tunnel%geology%TBM
通过单护盾、双护盾TBM掘进技术在甘肃引洮供水工程总干渠7^#、9^#隧洞中的应用,证明了TBM掘进设备的选型依据,说明了超前地质预报、合理选择注浆技术的重要性,提出了对设备改进的建议。
通過單護盾、雙護盾TBM掘進技術在甘肅引洮供水工程總榦渠7^#、9^#隧洞中的應用,證明瞭TBM掘進設備的選型依據,說明瞭超前地質預報、閤理選擇註漿技術的重要性,提齣瞭對設備改進的建議。
통과단호순、쌍호순TBM굴진기술재감숙인조공수공정총간거7^#、9^#수동중적응용,증명료TBM굴진설비적선형의거,설명료초전지질예보、합리선택주장기술적중요성,제출료대설비개진적건의。
The application of single and paired protecting shield TBM' s boring technology in main channel' s 7 ^# and 9 ^# tunnel of Gansu Yintao Water Supply Project is discussed here in detail, the selection bases of TBM excavation equipment are proved, the importance of geological prediction and that of reasonable grouting technology are explained, and the advices to improve the equipment are put forward at last.