结合基坑工程实际,详细介绍了基坑开挖及基底施工的过程,进一步说明场地的地质勘察是基坑工程施工的基础.基坑开挖必须在施工过程不断完善改进中进行,以保证工程质量.
結閤基坑工程實際,詳細介紹瞭基坑開挖及基底施工的過程,進一步說明場地的地質勘察是基坑工程施工的基礎.基坑開挖必鬚在施工過程不斷完善改進中進行,以保證工程質量.
결합기갱공정실제,상세개소료기갱개알급기저시공적과정,진일보설명장지적지질감찰시기갱공정시공적기출.기갱개알필수재시공과정불단완선개진중진행,이보증공정질량.
By combining with foundation projects, the paper gives a detailed introduction of the earth excavation project and the process of pit construction, further indicates the geological inspection of the field is the basement of the foundation pit project, and the foundation excavation can be increasingly improved in the engineering process, so as to ensure the quality of the engineering.