100m高烟囱%定向倒塌%着地振动%减振设计
100m高煙囪%定嚮倒塌%著地振動%減振設計
100m고연창%정향도탑%착지진동%감진설계
介绍100 m高烟囱和厂房一起爆破拆除,通过时差控制,使烟囱倒塌在尚未完全着地的厂房上,振动测试表明100 m高烟囱的着地振动大大小于预计着地振动。
介紹100 m高煙囪和廠房一起爆破拆除,通過時差控製,使煙囪倒塌在尚未完全著地的廠房上,振動測試錶明100 m高煙囪的著地振動大大小于預計著地振動。
개소100 m고연창화엄방일기폭파탁제,통과시차공제,사연창도탑재상미완전착지적엄방상,진동측시표명100 m고연창적착지진동대대소우예계착지진동。
A 100 m-high chimney and a workshop were simultaneously blasting demolished.Through controlling the time difference of collapse, the chimney was controlled to collapse on a collapsing workshop, the vibration test showed that the surface vibration caused by the chimney collapsed in such way is remarkably lowered than that in ordinary way.