大断面%公路隧道%流变模型%辨识
大斷麵%公路隧道%流變模型%辨識
대단면%공로수도%류변모형%변식
large section%highway tunnel%rheology model%identification
基于室内土样的流变试验结果和现场监控量测数据,结合岩土流变本构理论,并参考相关工程资料,对龙头山隧道洞口段 V 级围岩、洞身段 II~IV 级围岩的流变模型进行了辨识,为系统进行龙头山隧道工程的流变效应研究奠定了基础.
基于室內土樣的流變試驗結果和現場鑑控量測數據,結閤巖土流變本構理論,併參攷相關工程資料,對龍頭山隧道洞口段 V 級圍巖、洞身段 II~IV 級圍巖的流變模型進行瞭辨識,為繫統進行龍頭山隧道工程的流變效應研究奠定瞭基礎.
기우실내토양적류변시험결과화현장감공량측수거,결합암토류변본구이론,병삼고상관공정자료,대룡두산수도동구단 V 급위암、동신단 II~IV 급위암적류변모형진행료변식,위계통진행룡두산수도공정적류변효응연구전정료기출.
Based on the reheological indoor test results of soil samples and on-site monitoring measurement data, combined with rock rheological constitutive theory, and taking into account relevant information on the project,reheology model of the V grade rock on the starting of longtoushan tunnel and that of the II~IV grade rock of longtoushan tunnel are identified, laying the foundation for the reheology characterastic study of the project of longtoushan tunnel.