十年打造珠江口"水上高速航路"——经修订的《珠江口水域船舶安全航行规定》于4月1日正式实施十年打造珠江口"水上高速航路"——經脩訂的《珠江口水域船舶安全航行規定》于4月1日正式實施 십년타조주강구"수상고속항로"——경수정적《주강구수역선박안전항행규정》우4월1일정식실시 Ten-year construction of the" marine expressed route" at the mouth of the Pearl River-the revised Provisions for Safe Navigation of Ships in Waters of the Mouth of the Pearl River became effective on 1 April 2010
万方数据
中国海事中國海事중국해사 CHINA MARITIME SAFETY 2010年4期40-41,共2页