井筒施工%流砂层%溃沙冒顶%地面强排水%注浆堵水
井筒施工%流砂層%潰沙冒頂%地麵彊排水%註漿堵水
정통시공%류사층%궤사모정%지면강배수%주장도수
shaft construction%drift sand layer%sand inrush and roof fall%strong ground drainage%grouting and blocking water
榆林煤矿在井筒施工工程中遇到流砂层,且砂层涌水量大,造成各井筒涌水溃沙,给井筒施工带来很大困难,多次发生井筒冒顶和淹井情况,本文通过对施工困难的全面分析,提出了合理可行的解决方案,并且成功穿越了流砂层,为国内建井穿越流砂层开辟了新的途径。
榆林煤礦在井筒施工工程中遇到流砂層,且砂層湧水量大,造成各井筒湧水潰沙,給井筒施工帶來很大睏難,多次髮生井筒冒頂和淹井情況,本文通過對施工睏難的全麵分析,提齣瞭閤理可行的解決方案,併且成功穿越瞭流砂層,為國內建井穿越流砂層開闢瞭新的途徑。
유림매광재정통시공공정중우도류사층,차사층용수량대,조성각정통용수궤사,급정통시공대래흔대곤난,다차발생정통모정화엄정정황,본문통과대시공곤난적전면분석,제출료합리가행적해결방안,병차성공천월료류사층,위국내건정천월류사층개벽료신적도경。
Drift sand layer was met in the shaft construction of Yulin Coal Mine, and the large water inflow caused water inrush and sand inrush in all shafts, bringing great difficulties to shaft construction, and roof fall and shaft submergence happened many times. Through full analysis of construction difficulty, this paper proposes a feasible solution and managed to cross the drift sand layer and opened a new way of crossing drift sand layer in shaft construction in China.