为了深入研究土层锚杆可能出现的各种病害及原因,有针对性地提出防治措施,进行了室内模型试验.根据试验结果分析了在水的作用下土层锚杆破坏时的应力传递过程,提出土层锚杆发生破坏时所遵循的逐次破坏的突破观点.首先失效的是坡顶锚杆,其次是坡脚的锚杆,最后才是坡体中部的锚杆.并对破坏时土层锚杆发生的6种病害形式进行了详细论述及原因分析: 灌浆体和土体界面的破坏、土体的破坏、锥体-黏结复合破坏、锥体破坏、灌浆体的拉裂和压碎、灌浆体与杆体之间的黏结破坏.在综合分析的基础上,提出了土层锚杆常见病害防治的几个关键性对策.
為瞭深入研究土層錨桿可能齣現的各種病害及原因,有針對性地提齣防治措施,進行瞭室內模型試驗.根據試驗結果分析瞭在水的作用下土層錨桿破壞時的應力傳遞過程,提齣土層錨桿髮生破壞時所遵循的逐次破壞的突破觀點.首先失效的是坡頂錨桿,其次是坡腳的錨桿,最後纔是坡體中部的錨桿.併對破壞時土層錨桿髮生的6種病害形式進行瞭詳細論述及原因分析: 灌漿體和土體界麵的破壞、土體的破壞、錐體-黏結複閤破壞、錐體破壞、灌漿體的拉裂和壓碎、灌漿體與桿體之間的黏結破壞.在綜閤分析的基礎上,提齣瞭土層錨桿常見病害防治的幾箇關鍵性對策.
위료심입연구토층묘간가능출현적각충병해급원인,유침대성지제출방치조시,진행료실내모형시험.근거시험결과분석료재수적작용하토층묘간파배시적응력전체과정,제출토층묘간발생파배시소준순적축차파배적돌파관점.수선실효적시파정묘간,기차시파각적묘간,최후재시파체중부적묘간.병대파배시토층묘간발생적6충병해형식진행료상세논술급원인분석: 관장체화토체계면적파배、토체적파배、추체-점결복합파배、추체파배、관장체적랍렬화압쇄、관장체여간체지간적점결파배.재종합분석적기출상,제출료토층묘간상견병해방치적궤개관건성대책.
The paper is engaged in the study of the failures or defects of anchors with our analysis of the likely causes of such failure in addition to the introduction to effective measures on their prevention. In proceeding with our study, we have done a series of room model tests in this way in hoping to thoroughly study the common cases of such failure with corresponding control measures put forward. In the paper, we have first of all introduced our design and test process, with the focus of our study laid on the strain figure of the end of anchorage segment, slip surface and slope for the same row anchors. The experimental results of ours prove that the stress transmission of destructive process tends to account for such failures of the anchors in clay with water. Here we have put forward a breakthrough brink point of view for the successive destruction, saying that the primary failure is likely to take place just over a hill, followed by the foot of the slope, and finally by the central slope. The author has also made a discussion in detail on six kinds of likely failure modes and their causes: the destruction in the interface for grouting and soil mass, the destruction of soil mass, cone-shape bonded compound damage, cone-shape damage, grouting fracture and crushing, bonded damage in the interface for grouting and bolting. The conclusion has been made on the key causes leading to the defects is the action of water and internal stability of the anchors in clay, and in turn a few corresponding countermeasures proposed, such as reduction of the water influence, length of the anchor, improvement of the anchor's pullout resistance and higher strength of the construction quality.