铁道学报
鐵道學報
철도학보
2009年
6期
83-90
,共8页
张新金%刘维宁%路美丽%郭婷%李晓霖%郭德友
張新金%劉維寧%路美麗%郭婷%李曉霖%郭德友
장신금%류유저%로미려%곽정%리효림%곽덕우
盾构扩挖法%盾构过站%地铁车站%管片%结构方案
盾構擴挖法%盾構過站%地鐵車站%管片%結構方案
순구확알법%순구과참%지철차참%관편%결구방안
shield-driven tunnelling combined with the mining or open cut method%shield machine driving through a station%metro station%segment%structure scheme
盾构扩挖法建造地铁车站能够很好地解决地铁建设中盾构过站的问题.选取北京地铁10号线三元桥车站自起始里程18.6 m范围作为试验段,开展盾构法与明挖法结合建造地铁车站的结构方案研究.根据三元桥车站试验段的地理位置和建筑结构设计要求,进行塔柱式和立柱式共4种车站型式的结构设计,比选后推荐采用2.5 m侧站台立柱式车站结构方案.对该新型地铁车站结构设计中的关键问题,即特殊管片结构以及管片与车站主体结构连接的节点设计进行详细探讨,同时对结构防水方案进行研究.该结构方案符合国内目前的盾构技术和经济水平,为后续的研究工作奠定良好的基础.
盾構擴挖法建造地鐵車站能夠很好地解決地鐵建設中盾構過站的問題.選取北京地鐵10號線三元橋車站自起始裏程18.6 m範圍作為試驗段,開展盾構法與明挖法結閤建造地鐵車站的結構方案研究.根據三元橋車站試驗段的地理位置和建築結構設計要求,進行塔柱式和立柱式共4種車站型式的結構設計,比選後推薦採用2.5 m側站檯立柱式車站結構方案.對該新型地鐵車站結構設計中的關鍵問題,即特殊管片結構以及管片與車站主體結構連接的節點設計進行詳細探討,同時對結構防水方案進行研究.該結構方案符閤國內目前的盾構技術和經濟水平,為後續的研究工作奠定良好的基礎.
순구확알법건조지철차참능구흔호지해결지철건설중순구과참적문제.선취북경지철10호선삼원교차참자기시리정18.6 m범위작위시험단,개전순구법여명알법결합건조지철차참적결구방안연구.근거삼원교차참시험단적지리위치화건축결구설계요구,진행탑주식화립주식공4충차참형식적결구설계,비선후추천채용2.5 m측참태립주식차참결구방안.대해신형지철차참결구설계중적관건문제,즉특수관편결구이급관편여차참주체결구련접적절점설계진행상세탐토,동시대결구방수방안진행연구.해결구방안부합국내목전적순구기술화경제수평,위후속적연구공작전정량호적기출.
The problem of shield machine driving through a station in Metro construction can be well solved by combining shield-driven tunnelling with mining or open cut excavation. Taking the starting 18.6 m of the San-yuanqiao Station of Beijing Metro Line 10 as the test section,the structure scheme of the Metro station adopting shield tunnelling and open cut methods was studied. According to the geographical position of the Sanyuanqiao Station and the design requirements of architectures and structures,4 kinds of station structures were designed including the pylon column station and vertical column station.Finally the 2.5 m side vertical column station was recommended. The special segment structure and joints of the segments with the main station structure,the key issues in structure design of a new Metro station,were studied in detail. The waterproof scheme of the station structure was also studied. The proposed Metro station structure scheme is in line with the level of the domestic shielding technology and economic strength. It has laid a good basis for follow-up researches.