百色水利枢纽地下水电站进水塔结构布置,较好地适应了地基复杂的地形地质条件,水流流态良好。对进水塔结构进行静、动力计算研究结果表明,其稳定、应力均满足要求。
百色水利樞紐地下水電站進水塔結構佈置,較好地適應瞭地基複雜的地形地質條件,水流流態良好。對進水塔結構進行靜、動力計算研究結果錶明,其穩定、應力均滿足要求。
백색수리추뉴지하수전참진수탑결구포치,교호지괄응료지기복잡적지형지질조건,수류류태량호。대진수탑결구진행정、동력계산연구결과표명,기은정、응력균만족요구。
The structure arrangement of the intake tower for the underground hydropower station of Baise project is suit to the complex topography and geology condition, and the hydraulic test shown that the flow pattern entering the tower is well. The static and dynamic 3-D finite element analysis for the intake tower shown that the stability and stress of the stucture satisfy the specification.