中国石油大学学报(自然科学版)
中國石油大學學報(自然科學版)
중국석유대학학보(자연과학판)
JOURNAL OF CHINA UNIVERSITY OF PETROLEUM(EDITION OF NATURAL SCIENCE)
2010年
2期
56-61,66
,共7页
王瑞和%李罗鹏%周卫东%李华周
王瑞和%李囉鵬%週衛東%李華週
왕서화%리라붕%주위동%리화주
磨料射流%旋转切割%套管%能量原理%数学模型
磨料射流%鏇轉切割%套管%能量原理%數學模型
마료사류%선전절할%투관%능량원리%수학모형
abrasive water jet%rotary cutting%casing%energy conservation law%mathematical model
针对海洋废弃井口切除的工程需求,在淹没条件下进行射流压力、喷嘴直径、喷嘴个数、切割头转速、切割持续时间、喷距、磨料质量分数、磨料种类等因素对切割影响规律的试验研究,并建立淹没条件下套管切深与时间关系的工程计算模型.结果表明:高射流压力、大直径喷嘴、较多的喷嘴个数、长作业时间、小喷距时切割深度较大;切割头最优转速为7.8 r/min;磨料质量分数在26.1%时切割效率最高;铁砂的切割效果最好;工程计算模型可为套管切割深度的预测和套管切断时机的判断提供理论依据.
針對海洋廢棄井口切除的工程需求,在淹沒條件下進行射流壓力、噴嘴直徑、噴嘴箇數、切割頭轉速、切割持續時間、噴距、磨料質量分數、磨料種類等因素對切割影響規律的試驗研究,併建立淹沒條件下套管切深與時間關繫的工程計算模型.結果錶明:高射流壓力、大直徑噴嘴、較多的噴嘴箇數、長作業時間、小噴距時切割深度較大;切割頭最優轉速為7.8 r/min;磨料質量分數在26.1%時切割效率最高;鐵砂的切割效果最好;工程計算模型可為套管切割深度的預測和套管切斷時機的判斷提供理論依據.
침대해양폐기정구절제적공정수구,재엄몰조건하진행사류압력、분취직경、분취개수、절할두전속、절할지속시간、분거、마료질량분수、마료충류등인소대절할영향규률적시험연구,병건립엄몰조건하투관절심여시간관계적공정계산모형.결과표명:고사류압력、대직경분취、교다적분취개수、장작업시간、소분거시절할심도교대;절할두최우전속위7.8 r/min;마료질량분수재26.1%시절할효솔최고;철사적절할효과최호;공정계산모형가위투관절할심도적예측화투관절단시궤적판단제공이론의거.
According to the engineering requirement of cutting abandoned sub sea wellhead, cutting experiments were done in submerged condition, and the influences of various factors including water jet pressure, nozzle diameter, number of nozzles, rotation speed of cutting head, duration of cutting, standoff distance, mass fraction of abrasive, abrasive category on cutting effect were analyzed. And a mathematical model of relationship between the cutting depth of casing and time in submerged condition was established. The results indicate that the cutting depth is bigger in the conditions of high jet pressure, major diameter nozzle, more nozzles, long working time and small standoff distance. The optimum rotation speed of cutting head is 7. 8 r/min. The cutting efficiency is the highest when the mass fraction of abrasive is 26. 1 % , and the cutting efficiency of i-ron sand is the best. The mathematical model provides theoretical basis for predicting cutting depth of casing and confirmation of whether the cutting job of casing was completed or not.