该文结合大量长时间序列水下地形资料和近期水文泥沙资料,论述了废黄河三角洲的侵蚀过程、机制及近期动态:具体分析了滨海港区水下岸坡的侵蚀形态以及滨海港区10万t级航道工程对海岸稳定性的影响。研究表明.大浪作用对废黄河三角洲海岸侵蚀起控制作用,经1个多世纪的侵蚀,尽管其岸线仍向海凸出,但完整的水下三角洲形态已不复存在,近期侵蚀动态表现为水下岸坡的侵蚀陡坡整体内移,侵蚀速率已明显趋缓。拟建航道工程岸段岸线有效防护后,其稳定的水下岸坡坡度约1:85。航道工程的拦沙堤可拦截近岸粗化层泥沙,减轻或阻止堤前滩面进一步下蚀。对海岸防护具有积极作用。滨海港lO万t级航道的淤积主要为悬沙淤积,淤积强度相对较大的区域主要在内航道的近口门段及口外挖深相对较大区段。
該文結閤大量長時間序列水下地形資料和近期水文泥沙資料,論述瞭廢黃河三角洲的侵蝕過程、機製及近期動態:具體分析瞭濱海港區水下岸坡的侵蝕形態以及濱海港區10萬t級航道工程對海岸穩定性的影響。研究錶明.大浪作用對廢黃河三角洲海岸侵蝕起控製作用,經1箇多世紀的侵蝕,儘管其岸線仍嚮海凸齣,但完整的水下三角洲形態已不複存在,近期侵蝕動態錶現為水下岸坡的侵蝕陡坡整體內移,侵蝕速率已明顯趨緩。擬建航道工程岸段岸線有效防護後,其穩定的水下岸坡坡度約1:85。航道工程的攔沙隄可攔截近岸粗化層泥沙,減輕或阻止隄前灘麵進一步下蝕。對海岸防護具有積極作用。濱海港lO萬t級航道的淤積主要為懸沙淤積,淤積彊度相對較大的區域主要在內航道的近口門段及口外挖深相對較大區段。
해문결합대량장시간서렬수하지형자료화근기수문니사자료,논술료폐황하삼각주적침식과정、궤제급근기동태:구체분석료빈해항구수하안파적침식형태이급빈해항구10만t급항도공정대해안은정성적영향。연구표명.대랑작용대폐황하삼각주해안침식기공제작용,경1개다세기적침식,진관기안선잉향해철출,단완정적수하삼각주형태이불복존재,근기침식동태표현위수하안파적침식두파정체내이,침식속솔이명현추완。의건항도공정안단안선유효방호후,기은정적수하안파파도약1:85。항도공정적란사제가란절근안조화층니사,감경혹조지제전탄면진일보하식。대해안방호구유적겁작용。빈해항lO만t급항도적어적주요위현사어적,어적강도상대교대적구역주요재내항도적근구문단급구외알심상대교대구단。
In this paper, long time series data and new topography, hydrologic and sediment data were used to further discuss the erosion proeess,mechanisms and recent development at the the Abandoned Yellow River Delta(AYRD), which includes the detailed analysis of the coastal slope erosion patterns in Binhai Harbour (BH)and the influence of 100000 ton Deep Waterway Projeet(DWP)on its stability. Studies indicates that big waves play a key role in coastal erosion process at the AYRD,and after almost a century,though the shoreline is still protruding towards the sea,a complete underwater delta form has no longer existed. Recently, such erosion whose rate has slowed down, is represented by the integral shift of the eroded underwater slope towards the land. The stable underwater slope gradient will be about l:85,after effective methods on the defense of shoreline where the proposed project will be constructed are taken.The construction of jetty,applied to impede the coarsening sediment layer,has a positive effect on coastal protection, mitigating or preventing the further erosion on the beach. The deposition at DWP at BH is mainly the siltation of suspended sediment,with relative large siltation at the mouth of the inner channel and out channel near the estuary where the dredging depth is large.