西堠门大桥主缆除采用重防护涂装体系外,还采用"先缠丝,后铺装"施工技术.根据相关试验成果,确定施工中缠丝导入张力不小于2.3 kN.采用ZLCl000型缠丝机进行主缆缠丝.为方便主缆排水、减少主缆钢丝暴露外界时间,缠丝顺序为:先边跨后中跨,边跨从锚碇向桥塔方向进行,中跨则从桥塔向跨中方向推进.通过缠丝机将(φ)4 mm钢丝均匀紧密地缠绕在已涂覆底漆与不干腻子的索夹间主缆上,间隔一定距离以铝热焊剂焊接缠绕钢丝以保持其缠丝导入力,钢丝两端则固定于索夹.
西堠門大橋主纜除採用重防護塗裝體繫外,還採用"先纏絲,後鋪裝"施工技術.根據相關試驗成果,確定施工中纏絲導入張力不小于2.3 kN.採用ZLCl000型纏絲機進行主纜纏絲.為方便主纜排水、減少主纜鋼絲暴露外界時間,纏絲順序為:先邊跨後中跨,邊跨從錨碇嚮橋塔方嚮進行,中跨則從橋塔嚮跨中方嚮推進.通過纏絲機將(φ)4 mm鋼絲均勻緊密地纏繞在已塗覆底漆與不榦膩子的索夾間主纜上,間隔一定距離以鋁熱銲劑銲接纏繞鋼絲以保持其纏絲導入力,鋼絲兩耑則固定于索夾.
서후문대교주람제채용중방호도장체계외,환채용"선전사,후포장"시공기술.근거상관시험성과,학정시공중전사도입장력불소우2.3 kN.채용ZLCl000형전사궤진행주람전사.위방편주람배수、감소주람강사폭로외계시간,전사순서위:선변과후중과,변과종묘정향교탑방향진행,중과칙종교탑향과중방향추진.통과전사궤장(φ)4 mm강사균균긴밀지전요재이도복저칠여불간니자적색협간주람상,간격일정거리이려열한제한접전요강사이보지기전사도입력,강사량단칙고정우색협.
For the main cables of Xihoumen Bridge,in addition to the reinforced coating system applied to the cables,the construction technique of"wire wrapping first and deck surfacing late"was also applied.In accordance with the relevant test results,it was determined that the pretensioning force applied to the wire wrapping should not be less than 2.3 kN.The wires were wrapped onto the main cables of the Bridge by the ZLCl000 wrapping machine.To facilitate the water drainage from the cables and to reduce the exposure time of the wires of the cables to the outside,the sequences of the wire wrapping were:the cables were wrapped firstly from the side spans and then to the central span.At the side spans,the cables were wrapped from the anchorage towards the tower while at the central span,the cables were wrapped from the tower towards the midspan.By means of the wrapping machine,theφ4 mm wires were uniformly and tightly wrapped onto the cables that were already coated with primer paint and non-drying paste in between the cable bands.At a certain spacing,the wrapped wires were welded by the termite welding to keep the pretensioning force in the wires and both ends of the wires were fixed into cable bands.