引黄工程总干线一、二级地下泵站共130多个洞室,布置上立体交叉、纵横交错,开挖及一次性支护同时进行.但由于施工组织设计和进度安排工作做得较好,配备了较为先进和齐全的机械设备,采用和推广了一些新的施工工艺,因此,在测量控制、泵站厂房顶拱施工、竖井施工、岩锚梁基础开挖和监测仪器埋设方面取得了一些成果.
引黃工程總榦線一、二級地下泵站共130多箇洞室,佈置上立體交扠、縱橫交錯,開挖及一次性支護同時進行.但由于施工組織設計和進度安排工作做得較好,配備瞭較為先進和齊全的機械設備,採用和推廣瞭一些新的施工工藝,因此,在測量控製、泵站廠房頂拱施工、豎井施工、巖錨樑基礎開挖和鑑測儀器埋設方麵取得瞭一些成果.
인황공정총간선일、이급지하빙참공130다개동실,포치상입체교차、종횡교착,개알급일차성지호동시진행.단유우시공조직설계화진도안배공작주득교호,배비료교위선진화제전적궤계설비,채용화추엄료일사신적시공공예,인차,재측량공제、빙참엄방정공시공、수정시공、암묘량기출개알화감측의기매설방면취득료일사성과.
Underground pump station No.1 and No.2 of Yellow River Diversion Project includes more than 130 caverns in total,which are arranged in crisscross pattern and in grade separation,excavation and single support were conducted concurrently. As the construction organization design and progress program were made well and other measures were adopted ,such as using advanced and complete machinery,adopting and spreading some new construction workmanship,the Sixth Engineering Bureau of China Water Conservancy and Hydropower only spent 19.5 months finishing the excavation and single support for two large-scale underground pump stations according to the international project convention and under the condition of ensuring the construction quality and safety.The constnuction of these two pump stations was started at the same time and completed at the same time,which created a new record of water conservancy and hydropower construction all over the country.