介绍了在高温、混凝土运距远、技术难度高的情况下,一次性泵送顶升压注完成了武汉江汉五桥240m跨的拱桥钢管混凝土的施工过程,测定了在密封条件下混凝土的早期膨胀率和强度的发展规律,详细记录了泵送压力的变化过程。
介紹瞭在高溫、混凝土運距遠、技術難度高的情況下,一次性泵送頂升壓註完成瞭武漢江漢五橋240m跨的拱橋鋼管混凝土的施工過程,測定瞭在密封條件下混凝土的早期膨脹率和彊度的髮展規律,詳細記錄瞭泵送壓力的變化過程。
개소료재고온、혼응토운거원、기술난도고적정황하,일차성빙송정승압주완성료무한강한오교240m과적공교강관혼응토적시공과정,측정료재밀봉조건하혼응토적조기팽창솔화강도적발전규률,상세기록료빙송압력적변화과정。
In this article, authors introduce the construction pro cedure of steel pipe concrete of Wuhan Jianghan No.5 Arched Bridge whose span is 240m. This construction procedur e was finished with once pumping, jacking and pressed pouring under the situation of high temperature, lo ng distance transportation and high technical difficulty. Authors measured the development rules of concret e early-stage expansion rate and strength under sealed situation, and also recorded the change procedure of p umping pressure.