设计与建设穿越废矿区的竖井时会遇到许多问题.文章根据河城工程讨论了岩石迁移和压力形成规律,通过计算土压与井室厚度确定了废矿区对井室建设的影响和竖井偏差的影响,为井室建设提供了有用的资料.讨论了井室压力试验结果和施工技术,可为类似工程提供参考.
設計與建設穿越廢礦區的豎井時會遇到許多問題.文章根據河城工程討論瞭巖石遷移和壓力形成規律,通過計算土壓與井室厚度確定瞭廢礦區對井室建設的影響和豎井偏差的影響,為井室建設提供瞭有用的資料.討論瞭井室壓力試驗結果和施工技術,可為類似工程提供參攷.
설계여건설천월폐광구적수정시회우도허다문제.문장근거하성공정토론료암석천이화압력형성규률,통과계산토압여정실후도학정료폐광구대정실건설적영향화수정편차적영향,위정실건설제공료유용적자료.토론료정실압력시험결과화시공기술,가위유사공정제공삼고.
There will be many problems in the design and construction of vertical shaft when it passes through the worked-out mine area. This article discussed rock migration and the pressure initiation rules based on the case of He Cheng mine project. The influence on construction of the well chamber from worked-out mine area is determined through computation of geostatic pressure and well chamber thickness and the data of the influence on the distortion of vertical shaft well chamber can provide an effective information for the construction. Based on the above given, it discussed the well chamber pressure test result and the construction technology plan. It can serve as important guide to the similar projects.