针对核电机组实际启动前无法建立动态运行工况而导致无法对反应堆控制系统(RRC)的组态设计进行评估及分析的问题,介绍了利用反应堆热工水力仿真模型、Labview图形化虚拟仪表编程语言和DAQ数据采集技术研发的RRC仿真测试平台,通过将该测试平台与核电站的实际数字化仪表控制系统(DCS)机柜相连,对实际的RRC实施了单步和关联运行测试,实现了RRC功率运行或瞬态工况下的逻辑预演和动态评估,并逐一排查了大量设计错误或不符合项.岭澳二期核电站3/4号机组的应用实践证明,利用核电站仿真技术对RRC进行调试,可有效降低机组功率运行的大瞬态试验风险,缩短启动工期.
針對覈電機組實際啟動前無法建立動態運行工況而導緻無法對反應堆控製繫統(RRC)的組態設計進行評估及分析的問題,介紹瞭利用反應堆熱工水力倣真模型、Labview圖形化虛擬儀錶編程語言和DAQ數據採集技術研髮的RRC倣真測試平檯,通過將該測試平檯與覈電站的實際數字化儀錶控製繫統(DCS)機櫃相連,對實際的RRC實施瞭單步和關聯運行測試,實現瞭RRC功率運行或瞬態工況下的邏輯預縯和動態評估,併逐一排查瞭大量設計錯誤或不符閤項.嶺澳二期覈電站3/4號機組的應用實踐證明,利用覈電站倣真技術對RRC進行調試,可有效降低機組功率運行的大瞬態試驗風險,縮短啟動工期.
침대핵전궤조실제계동전무법건립동태운행공황이도치무법대반응퇴공제계통(RRC)적조태설계진행평고급분석적문제,개소료이용반응퇴열공수력방진모형、Labview도형화허의의표편정어언화DAQ수거채집기술연발적RRC방진측시평태,통과장해측시평태여핵전참적실제수자화의표공제계통(DCS)궤거상련,대실제적RRC실시료단보화관련운행측시,실현료RRC공솔운행혹순태공황하적라집예연화동태평고,병축일배사료대량설계착오혹불부합항.령오이기핵전참3/4호궤조적응용실천증명,이용핵전참방진기술대RRC진행조시,가유효강저궤조공솔운행적대순태시험풍험,축단계동공기.
Based on the nuclear power thermal-hydraulic model, Labview graphical programming lan-guage and virtual instrument data acquisition technology, this paper describes a dedicate test platform to solve the problem that the reactor control system (RRC) can not be evaluated and analyzed far before the actual startup of the unit. By connecting the test platform to the nuclear Digital Control System (DCS), the step-by-step closed-looped test and global function test of RRC system were performed, the dynamic valida-tion and logical function demonstration for RRC were realized, and a lot of configuration mistakes of RRC and nonconformity were solved. The test for unit 3 of Ling'ao phase Ⅱ has proved that the implementation of nuclear power plant simulation in the start-up commissioning of RRC can greatly reduce the risk of normal power operation and great transient tests, with which the term of startup for overall unit test can be greatly shortened.