魏秋晨%刘润%闫澍旺%朱红霞%程栋栋
魏鞦晨%劉潤%閆澍旺%硃紅霞%程棟棟
위추신%류윤%염주왕%주홍하%정동동
围海造陆%大面积吹填%附加荷载%管线保护
圍海造陸%大麵積吹填%附加荷載%管線保護
위해조륙%대면적취전%부가하재%관선보호
reclamation%large-area hydraulic filling%additional load%pipeline protection
当围海造陆工程需要覆盖原有海底管线时,对海管的不利影响包括两个方面:其一是隔埝与管线相交处,对管线局部造成较大的附加应力;其二是大面积吹填造陆,使管线受力发生变化.在这两种不利荷载的作用下,管线的安全运营受到威胁.结合实际工程,采用规范设计和有限元分析相结合的方法,分析了大面积吹填对海底管线的影响,并设计采用打桩加盖板的保护措施使隔埝能够安全地跨过海底管线.分析结果和实际观测表明,在现有的工况条件下管线上吹填土高度不宜大于4m,隔埝与管线相交处的保护方案具有有效性.
噹圍海造陸工程需要覆蓋原有海底管線時,對海管的不利影響包括兩箇方麵:其一是隔埝與管線相交處,對管線跼部造成較大的附加應力;其二是大麵積吹填造陸,使管線受力髮生變化.在這兩種不利荷載的作用下,管線的安全運營受到威脅.結閤實際工程,採用規範設計和有限元分析相結閤的方法,分析瞭大麵積吹填對海底管線的影響,併設計採用打樁加蓋闆的保護措施使隔埝能夠安全地跨過海底管線.分析結果和實際觀測錶明,在現有的工況條件下管線上吹填土高度不宜大于4m,隔埝與管線相交處的保護方案具有有效性.
당위해조륙공정수요복개원유해저관선시,대해관적불리영향포괄량개방면:기일시격념여관선상교처,대관선국부조성교대적부가응력;기이시대면적취전조륙,사관선수력발생변화.재저량충불리하재적작용하,관선적안전운영수도위협.결합실제공정,채용규범설계화유한원분석상결합적방법,분석료대면적취전대해저관선적영향,병설계채용타장가개판적보호조시사격념능구안전지과과해저관선.분석결과화실제관측표명,재현유적공황조건하관선상취전토고도불의대우4m,격념여관선상교처적보호방안구유유효성.
When there are submarine pipelines in operation in the reclamation areas, the reclamation activity will have two negative effects on the pipelines: (1)The hydraulic fill will take a large-scale additional load on the partial pipeline; (2)At positions where the dike crosses over the pipeline, the stresses in the pipeline will change. These two negative additional loads may cause failure to the submarine pipeline. Based on the engineering practice, the traditional design method and the finite element method were applied to analyzing this problem. The interaction between the soil and the pipeline was simulated with a spring in finite element modeling. For the local additional load, a simple structure which is composed of wood piles and concrete plates had been designed to protect the pipeline to bear the dike load. The analyzing results show that 4 m is the limit height for the large-scale hydraulic fill and the structure at the crossing position between the dike and pipeline can prevent the pipeline from failure.