三峡船闸第一闸首桥机排架柱灌注桩施工及费用组成分析
삼협선갑제일갑수교궤배가주관주장시공급비용조성분석
Construction of the cast-in-place piles for the bridge crane's trestle posts at lock head No.1 of Three Gorges Project ship lock and their cost composition analysis