中国矿业大学学报(英文版)
中國礦業大學學報(英文版)
중국광업대학학보(영문판)
JOURNAL OF CHINA UNIVERSITY OF MINING AND TECHNOLOGY
2001年
2期
113-117
,共5页
周华强%王光伟%雷文成%曲庆贺%李峰
週華彊%王光偉%雷文成%麯慶賀%李峰
주화강%왕광위%뢰문성%곡경하%리봉
fully-mechanized coal face%cross-roadway%high water-content material%filling%artificial bottom
A new method using high water-content material to mechanically fill cross-roadways to form artificial bottom for coal faces was introduced. The reasonable determination of filling range, the optimization of the compounding ratio of high water-content material, and the filling technique were discussed in detail. This new method has been spread after industrial testing in Baodian Colliery. Compared with the traditional method, the manual wooden chock method, the new one decreases about 40% of the filling range and cost in dealing every one set of cross-roadway in the testing condition.