电力系统及其自动化学报
電力繫統及其自動化學報
전력계통급기자동화학보
PROCEEDINGS OF THE CHINESE SOCIETY OF UNIVERSITIES
2010年
1期
13-19
,共7页
李可%马孝义%甘学涛%符少华
李可%馬孝義%甘學濤%符少華
리가%마효의%감학도%부소화
配电网络%规划%同步优化%遗传算法%整数编码
配電網絡%規劃%同步優化%遺傳算法%整數編碼
배전망락%규화%동보우화%유전산법%정수편마
electricity distribution network%plan%simultaneous optimization%genetic algorithm%integer code
针对配电网络中网架结构和馈线截面的分步优化难以获得全局最优解的问题,重点研究了以用电节点为基础的配电网络布置与馈线截面同步优化整数遗传算法编码方法,基于供用电节点矩阵转换的线路路径自动识别方法和配电网络系统中功率、电压等约束的自动计算方法,并引入退火罚因子设计动态罚函数处理约束条件,建立了基于整数遗传算法的配电网络规划同步优化的数学模型,实现了配电网络规划中网架结构和馈线截面的同步优化.算例表明,该方法克服了分步式优化方法不易得到全局最优解的缺陷,可以快速有效地得到配电网络的网架结构和馈线截面规划全局优化方案.同时该方法对其他领域最小生成树问题的求解也有一定借鉴作用.
針對配電網絡中網架結構和饋線截麵的分步優化難以穫得全跼最優解的問題,重點研究瞭以用電節點為基礎的配電網絡佈置與饋線截麵同步優化整數遺傳算法編碼方法,基于供用電節點矩陣轉換的線路路徑自動識彆方法和配電網絡繫統中功率、電壓等約束的自動計算方法,併引入退火罰因子設計動態罰函數處理約束條件,建立瞭基于整數遺傳算法的配電網絡規劃同步優化的數學模型,實現瞭配電網絡規劃中網架結構和饋線截麵的同步優化.算例錶明,該方法剋服瞭分步式優化方法不易得到全跼最優解的缺陷,可以快速有效地得到配電網絡的網架結構和饋線截麵規劃全跼優化方案.同時該方法對其他領域最小生成樹問題的求解也有一定藉鑒作用.
침대배전망락중망가결구화궤선절면적분보우화난이획득전국최우해적문제,중점연구료이용전절점위기출적배전망락포치여궤선절면동보우화정수유전산법편마방법,기우공용전절점구진전환적선로로경자동식별방법화배전망락계통중공솔、전압등약속적자동계산방법,병인입퇴화벌인자설계동태벌함수처리약속조건,건립료기우정수유전산법적배전망락규화동보우화적수학모형,실현료배전망락규화중망가결구화궤선절면적동보우화.산례표명,해방법극복료분보식우화방법불역득도전국최우해적결함,가이쾌속유효지득도배전망락적망가결구화궤선절면규화전국우화방안.동시해방법대기타영역최소생성수문제적구해야유일정차감작용.
In the traditional optimization design of electricity distribution network,network sturcture and conductor cross sections were optimized step by step,and can not get the global optimization scheme.An integer coding method based on a electricity node for network structure and conductor sections simultaneous optimization design was proposed.An automatical method for idectifying electricity flow route based on electricity node matrix transformation was deduced,and an automatically calculating program of electricity power and voltage of different nodes was developed.A dynamic penalty function was used to deal with the constrain conditions.Hence,an electricity distribution network structure and conductors cross sections simultaneous optimization model and its solution method based on integer code genetic algorithm were obtained.Two different electricity network examples,compared with optimized schemes based on traditional optimization method,show that the proposed model and algorithm can reduce electricity conductors cost of distrbution network,and can effectively get global optimization scheme of electricity distribution network.The method has a guiding role to other problem with solving minimum spanning tree.