两个细则%超超临界%AGC%一次调频%优化
兩箇細則%超超臨界%AGC%一次調頻%優化
량개세칙%초초림계%AGC%일차조빈%우화
Two detailed rules and regulations%Ultra-supercritical%AGC%Primary frequency%Optimization
介绍了在华东电网"两个细则"实施下,国华宁海发电公司B厂2伊1000MW超超临界机组AGC和一次调频控制系统存在的问题,并针对这些问题采取的优化方案。
介紹瞭在華東電網"兩箇細則"實施下,國華寧海髮電公司B廠2伊1000MW超超臨界機組AGC和一次調頻控製繫統存在的問題,併針對這些問題採取的優化方案。
개소료재화동전망"량개세칙"실시하,국화저해발전공사B엄2이1000MW초초림계궤조AGC화일차조빈공제계통존재적문제,병침대저사문제채취적우화방안。
This paper introduces the probtems existed in 1000MW ultra-supercritical unit AGC and primary frequency control system of platform 2 of plant B of Ninghai Power Generating Company as well as the corresponding adopted optimization scheme under the implementation of "two detailed rules and regulations" by East China Grid.