上海涂料
上海塗料
상해도료
SHANGHAI COATINGS
2012年
1期
31-32
,共2页
薛杰%王云飞%栗玉山
薛傑%王雲飛%慄玉山
설걸%왕운비%률옥산
汽车涂装%SE(同步工程).ECR(部件变更申请)%整车验证
汽車塗裝%SE(同步工程).ECR(部件變更申請)%整車驗證
기차도장%SE(동보공정).ECR(부건변경신청)%정차험증
automobile painting%simultaneous engineering ( SE )%equipment change request ( ECR )%vehicle verification
在数模分析阶段,通过整车验证所提交的ECR,总结成功的sE分析内容,为后续新车型或变型车的开发提供依据。
在數模分析階段,通過整車驗證所提交的ECR,總結成功的sE分析內容,為後續新車型或變型車的開髮提供依據。
재수모분석계단,통과정차험증소제교적ECR,총결성공적sE분석내용,위후속신차형혹변형차적개발제공의거。
The equipment change request (ECR)was committed through stage of mathematical model, and the successful contents of simulta the vehicle verification at neous engineering ( SE ) summarized in order to providing the basis for the development of subsequent new vehicle or changing analytical analysis were model vehicle.