PDCA%循环%预应力管桩%提高%工作效率
PDCA%循環%預應力管樁%提高%工作效率
PDCA%순배%예응력관장%제고%공작효솔
PDCA%cyclic%prestressed pipe pile%enhanced%work efficiency
结合苍南车站采用预应力管桩加固软土地基的工程实例,介绍了预应力管桩施工过程中运用PDCA循环管理方法,通过使用先进的机械设备和科学合理的施工组织安排及对重点工序的有效控制,从而提高工作效率,保证管柱质量.
結閤蒼南車站採用預應力管樁加固軟土地基的工程實例,介紹瞭預應力管樁施工過程中運用PDCA循環管理方法,通過使用先進的機械設備和科學閤理的施工組織安排及對重點工序的有效控製,從而提高工作效率,保證管柱質量.
결합창남차참채용예응력관장가고연토지기적공정실례,개소료예응력관장시공과정중운용PDCA순배관리방법,통과사용선진적궤계설비화과학합리적시공조직안배급대중점공서적유효공제,종이제고공작효솔,보증관주질량.
Combined with prestressed pipe pile reinforcement soft soil foundation adopted in Cangnan railway station, the PDCA cyclic manage-merit method applied in prestressed pipe pile construction process was introduced. The work efficiency was enhanced by adopting advanced ma-chine, scientific proper construction organization and effective control of important procedure, therefore guaranteed pipe pile quality.