山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
3期
279-281
,共3页
主控室%装修%质量控制
主控室%裝脩%質量控製
주공실%장수%질량공제
main control room%decoration%quality control
以中国试验快堆主控室装修为例,介绍了工程概况,结合其施工的特点和难点,阐述了在主控室装修施工监理中所采取的控制与协调措施,并针对装修施工过程中存在的问题进行思考,总结了施工经验,以指导今后同类项目。
以中國試驗快堆主控室裝脩為例,介紹瞭工程概況,結閤其施工的特點和難點,闡述瞭在主控室裝脩施工鑑理中所採取的控製與協調措施,併針對裝脩施工過程中存在的問題進行思攷,總結瞭施工經驗,以指導今後同類項目。
이중국시험쾌퇴주공실장수위례,개소료공정개황,결합기시공적특점화난점,천술료재주공실장수시공감리중소채취적공제여협조조시,병침대장수시공과정중존재적문제진행사고,총결료시공경험,이지도금후동류항목。
Taking the decoration of main control room of Chinese experimental fast reactor as an example,the essay introduces the project situation.Combining with the construction features and difficulties,it describes controlling and coordinating measures in decoration inspection of main control room,and considers problems existing in decoration process,and summarizes construction experience,so as to guide similar project in future.