交通运输系统工程与信息
交通運輸繫統工程與信息
교통운수계통공정여신식
JOURNAL OF COMMUNICATION AND TRANSPORTATION SYSTEMS ENGINEERING AND INFORMATION
2010年
1期
158-163
,共6页
铁路运输%专用线取送调车%禁忌搜索算法%非直达车流
鐵路運輸%專用線取送調車%禁忌搜索算法%非直達車流
철로운수%전용선취송조차%금기수색산법%비직체차류
railway transportation%fetching and delivering scheme%taboo search algorithm%non-through wagon flow
放射形专用线非直达车流取送方案的选择是一个非常复杂的组合优化问题,当作业的专用线数为n时,取送方案数达到(n!)~2,采用经典算法求解用时太长.为了提高非直达车流取送方案的计算效率,将禁忌搜索算法同时用于送车方案和取车方案的求解过程.对禁忌搜索算法的主要因素进行了设计,通过两组实例仿真,验证了禁忌搜索算法用于求解非直达车流取送方案的有效性.仿真结果表明,专用线数越多,计算时间越长;在专用线数一定的条件下,最优方案的等值方案数越少,搜索范围就越大,计算用时也越长.专用线不超过8条时,计算用时不超过3 s,计算效率满足了现场生产需要.
放射形專用線非直達車流取送方案的選擇是一箇非常複雜的組閤優化問題,噹作業的專用線數為n時,取送方案數達到(n!)~2,採用經典算法求解用時太長.為瞭提高非直達車流取送方案的計算效率,將禁忌搜索算法同時用于送車方案和取車方案的求解過程.對禁忌搜索算法的主要因素進行瞭設計,通過兩組實例倣真,驗證瞭禁忌搜索算法用于求解非直達車流取送方案的有效性.倣真結果錶明,專用線數越多,計算時間越長;在專用線數一定的條件下,最優方案的等值方案數越少,搜索範圍就越大,計算用時也越長.專用線不超過8條時,計算用時不超過3 s,計算效率滿足瞭現場生產需要.
방사형전용선비직체차류취송방안적선택시일개비상복잡적조합우화문제,당작업적전용선수위n시,취송방안수체도(n!)~2,채용경전산법구해용시태장.위료제고비직체차류취송방안적계산효솔,장금기수색산법동시용우송차방안화취차방안적구해과정.대금기수색산법적주요인소진행료설계,통과량조실례방진,험증료금기수색산법용우구해비직체차류취송방안적유효성.방진결과표명,전용선수월다,계산시간월장;재전용선수일정적조건하,최우방안적등치방안수월소,수색범위취월대,계산용시야월장.전용선불초과8조시,계산용시불초과3 s,계산효솔만족료현장생산수요.
The optimal vehicle fetching and delivering schemes of non-through vehicle flows for the actiniform dedicated lines is a complex combined optimization problem. When the number of the lines is noted by n, the number of the schemes reaches ( n!)~2. The traditional algorithm is time-consuming to solve the problem. To increase the calculating efficiency, the taboo searching algorithm is applied to the process both solving the delivering scheme and the fetching scheme. The main factors of the taboo searching algorithm are designed, and by the instance simulation for two cases, the effectiveness for the algorithm to solve the fetching and delivering scheme is verified. The simulation results show that the more the number of the dedicated lines, the longer the calculating time is; In the condition that the number of the dedicated line is given, the smaller the number of the schemes equivalent to the optimal scheme, the bigger the searching range will be and the longer the time needed for calculation will be. If the number of the dedicated lines does not exceed 8, the time needed for calculating the schemes does not exceed 3 s which meets the requirement of railway production practice.