水利水电技术
水利水電技術
수이수전기술
WATER RESOURCES AND HYDROPOWER ENGINEERING
2009年
11期
76-79
,共4页
浅埋暗挖输水隧洞%有限元法%隧洞衬砌%应力状态%南水北调中线工程
淺埋暗挖輸水隧洞%有限元法%隧洞襯砌%應力狀態%南水北調中線工程
천매암알수수수동%유한원법%수동츤체%응력상태%남수북조중선공정
shallow-buried and underground-excavated water conveyance tunnel%FEM%tunnel lining%stress status%Mid-route of South-to-North Water Transfer Project
以南水北调中线北京段浅埋暗挖输水隧洞施工为研究实例,使用三维有限元程序ADINA对隧洞衬砌在施工期及运行期不同工况下的受力状态进行了分析计算,得到了工程设计中比较关心的弯矩和轴力等内力计算结果,为工程设计提供参考.
以南水北調中線北京段淺埋暗挖輸水隧洞施工為研究實例,使用三維有限元程序ADINA對隧洞襯砌在施工期及運行期不同工況下的受力狀態進行瞭分析計算,得到瞭工程設計中比較關心的彎矩和軸力等內力計算結果,為工程設計提供參攷.
이남수북조중선북경단천매암알수수수동시공위연구실례,사용삼유유한원정서ADINA대수동츤체재시공기급운행기불동공황하적수력상태진행료분석계산,득도료공정설계중비교관심적만구화축력등내력계산결과,위공정설계제공삼고.
Taken the construction of the shaUow-buried and underground-excavated water conveyance tunnel within Beijing Section of the Mid-route of the South-to-North Water Transfer project as an actual studying case, the stress status of the tunnel lining during the construction and under different operation conditions are analyzed and calculated with the 3D finite element program ADINA, and then the calculation results of the intemal forces such as bending moment, axial force, etc. concerned in the design of the project are obtained; which can be provided as the references for the design.