电力系统自动化
電力繫統自動化
전력계통자동화
AUTOMATION OF ELECTRIC POWER SYSTEMS
2011年
17期
103-106
,共4页
刘耀%刘翀%曾南超%蒋卫平%杨万开
劉耀%劉翀%曾南超%蔣衛平%楊萬開
류요%류충%증남초%장위평%양만개
特高压直流%系统调试%换流变压器%充电
特高壓直流%繫統調試%換流變壓器%充電
특고압직류%계통조시%환류변압기%충전
ultra-high voltage direct current(UHVDC)%system commissioning%converter transformer%energization
向家坝—上海(简称向-上)±800kV特高压直流输电工程第3阶段系统调试初期,复龙换流站极Ⅰ高端换流变压器前3次充电均未成功。文中基于换流阀阀基电子设备(VBE)在换流变压器充电后启动的自检功能及其原理,结合换流阀冷却主回路的主副水泵切换逻辑与换流变压器在充电过程中产生的励磁涌流情况,深入分析了换流变压器充电失败原因,并得出结论:在换流变压器充电过程中,由于励磁涌流较大、送端系统较弱,导致换流母线交流电压畸变严重,使得换流阀自检功能误判认为阀出现故障,以及阀内水冷回路主循环泵异常切换,从而导致充电失败。根据分析结论,对相应问题提出了修改建议,为直流工程运行和以后的相应试验项目提供技术参考依据。
嚮傢壩—上海(簡稱嚮-上)±800kV特高壓直流輸電工程第3階段繫統調試初期,複龍換流站極Ⅰ高耑換流變壓器前3次充電均未成功。文中基于換流閥閥基電子設備(VBE)在換流變壓器充電後啟動的自檢功能及其原理,結閤換流閥冷卻主迴路的主副水泵切換邏輯與換流變壓器在充電過程中產生的勵磁湧流情況,深入分析瞭換流變壓器充電失敗原因,併得齣結論:在換流變壓器充電過程中,由于勵磁湧流較大、送耑繫統較弱,導緻換流母線交流電壓畸變嚴重,使得換流閥自檢功能誤判認為閥齣現故障,以及閥內水冷迴路主循環泵異常切換,從而導緻充電失敗。根據分析結論,對相應問題提齣瞭脩改建議,為直流工程運行和以後的相應試驗項目提供技術參攷依據。
향가패—상해(간칭향-상)±800kV특고압직류수전공정제3계단계통조시초기,복룡환류참겁Ⅰ고단환류변압기전3차충전균미성공。문중기우환류벌벌기전자설비(VBE)재환류변압기충전후계동적자검공능급기원리,결합환류벌냉각주회로적주부수빙절환라집여환류변압기재충전과정중산생적려자용류정황,심입분석료환류변압기충전실패원인,병득출결론:재환류변압기충전과정중,유우려자용류교대、송단계통교약,도치환류모선교류전압기변엄중,사득환류벌자검공능오판인위벌출현고장,이급벌내수랭회로주순배빙이상절환,종이도치충전실패。근거분석결론,대상응문제제출료수개건의,위직류공정운행화이후적상응시험항목제공기술삼고의거。
A particular analysis about the first three energization failures of pole Ⅰ high voltage converter transformer at Fulong station during initial stage of the third phase commissioning of Xiang-Shang ±800 kV ultra-high voltage direct current(UHVDC) transmission project is presented.Based on the function and operation principle of valve base electronics(VBE),switching philosophy of valve cooling system,and inrush current produced when energizing the transformer,a study on energization failure is completed.It is concluded that high inrush current and weak sending terminal,which causes distortion of bus-bar AC voltage,result in a valve fault erratically detected by the VBE,and valve cooling systems switching over abnormally so as to trip the transformer.Some suggestions based on the conclusion are proposed for solving these problems,which can also provide certain technical reference for normal operation of existing and coming projects.