科学之友
科學之友
과학지우
FRIEND OF SCIENCE AMATEURS
2009年
12期
65-67
,共3页
50mT梁%架设%安装
50mT樑%架設%安裝
50mT량%가설%안장
50 meters T beam%erection%installation
文章以重庆奉云高速公路B10合同段围溪沟大桥73 m,高墩50 m预应力T梁顺利完成安装为例,介绍50 mT梁安装的工作流程及注意事项,并总结施工经验.
文章以重慶奉雲高速公路B10閤同段圍溪溝大橋73 m,高墩50 m預應力T樑順利完成安裝為例,介紹50 mT樑安裝的工作流程及註意事項,併總結施工經驗.
문장이중경봉운고속공로B10합동단위계구대교73 m,고돈50 m예응력T량순리완성안장위례,개소50 mT량안장적공작류정급주의사항,병총결시공경험.
Article B10 Chongqing Expressway contract cloud from above XigouWai Bridge 73 meters, 50 meters high pier T prestressed beam as an example the successful completion of the installation on the 50 meters T beam installed workflow and attention, and summed up the experience in the construction.