商品与质量:建筑与发展
商品與質量:建築與髮展
상품여질량:건축여발전
2011年
9期
54-55
,共2页
覆盖型岩溶%地面塌陷%勘察%注浆加固
覆蓋型巖溶%地麵塌陷%勘察%註漿加固
복개형암용%지면탑함%감찰%주장가고
covered karst ground subsidence reconnaissance grouting reinforcement
针对沪昆铁路宜春站3道发生的地面塌陷,分析了该段路基度站台岩溶发育特征和塌陷形成机理,评价了其稳定性,提出并实施了有效的岩溶整治措施。
針對滬昆鐵路宜春站3道髮生的地麵塌陷,分析瞭該段路基度站檯巖溶髮育特徵和塌陷形成機理,評價瞭其穩定性,提齣併實施瞭有效的巖溶整治措施。
침대호곤철로의춘참3도발생적지면탑함,분석료해단로기도참태암용발육특정화탑함형성궤리,평개료기은정성,제출병실시료유효적암용정치조시。
Shanghai-Kunming railway Yi Chun stage No.3 has occurred ground collapse. The subgrade, karst features of the site, and the conformation of the mechanism of collapse has been analyzed. Its stability has been evaluated and an effective karst remediation measures has been proposed and implemented.