300 m超长综放工作面整体顶梁支架受力及参数分析
300 m초장종방공작면정체정량지가수력급삼수분석
Analysis of the loads and parameters of support with integrated roof timber in fully mechanized sublevel coal caving workface with length of 300 m
저자의 최근 논문