桥梁建设
橋樑建設
교량건설
BRIDGE CONSTRUCTION
2010年
1期
1-4
,共4页
高速铁路%钢桁拱%主桁%正交异性钢桥面板%吊杆%联结系%桥梁设计
高速鐵路%鋼桁拱%主桁%正交異性鋼橋麵闆%弔桿%聯結繫%橋樑設計
고속철로%강항공%주항%정교이성강교면판%조간%련결계%교량설계
high-speed railway%steel truss arch%main truss%orthotropic steel deck plate%hanger%bracing system%bridge design
京沪高速铁路南京大胜关长江大桥为主跨336 m的连续钢桁拱桥,设计速度目标值300 km/h,设计荷栽为6线铁路荷载.主桁采用整体节点,弦杆采用箱形带肋杆件;桥面采用正交异性板整体钢桥面,分块制造、安装;为提高截面刚度、改善气动性能及增加阻尼,吊杆设计成八边形截面并预留阻尼器安装空间;平面及横向联结系采用刚度大、有利于3片主桁内力均匀分配的X形构造;使用墩旁托架及拉索辅助钢梁安装,利用拉索调整主跨合龙口位移.大桥施工进展顺利,2009年9月底主桥钢梁安装完成,预计2010年上半年达到铺轨条件.
京滬高速鐵路南京大勝關長江大橋為主跨336 m的連續鋼桁拱橋,設計速度目標值300 km/h,設計荷栽為6線鐵路荷載.主桁採用整體節點,絃桿採用箱形帶肋桿件;橋麵採用正交異性闆整體鋼橋麵,分塊製造、安裝;為提高截麵剛度、改善氣動性能及增加阻尼,弔桿設計成八邊形截麵併預留阻尼器安裝空間;平麵及橫嚮聯結繫採用剛度大、有利于3片主桁內力均勻分配的X形構造;使用墩徬託架及拉索輔助鋼樑安裝,利用拉索調整主跨閤龍口位移.大橋施工進展順利,2009年9月底主橋鋼樑安裝完成,預計2010年上半年達到鋪軌條件.
경호고속철로남경대성관장강대교위주과336 m적련속강항공교,설계속도목표치300 km/h,설계하재위6선철로하재.주항채용정체절점,현간채용상형대륵간건;교면채용정교이성판정체강교면,분괴제조、안장;위제고절면강도、개선기동성능급증가조니,조간설계성팔변형절면병예류조니기안장공간;평면급횡향련결계채용강도대、유리우3편주항내력균균분배적X형구조;사용돈방탁가급랍색보조강량안장,이용랍색조정주과합룡구위이.대교시공진전순리,2009년9월저주교강량안장완성,예계2010년상반년체도포궤조건.
Nanjing Dashengguan ChangJiang River Bridge on Beijing-Shanghai High-Speed Railway is a continuous steel truss arch bridge with two main spans each 336 m.The designed target running speed for the Bridge is 300 km/h and the designed load is the six-track railway load.On the main trusses of the Bridge,the integral panel points are used,the chords of the trusses are of the box section members with ribs and the bridge deck is provided with the integral orthotropic steel deck which is manufactured and installed in segments.To increase the sectional rigidity and enhance the aerodynamic and damping performance of the Bridge,the hangers of the truss arches are designed into the octagon sections and the space for future installation of dampers is preserved.For the plane and lateral bracing systems,the X-shape connections that have great rigidity and that can facilitate the uniform distribution of the internal forces of the three main trusses are used.The truss girders of the Bridge are erected by the pier-side brackets in the aid of stay cables and are closed by adjusting the opening in between the girders at the main spans by the stay cables.The construction of this Bridge proceeded smoothly,the erection of the girders thereof were completed by the end of September,2009 and it is anticipated that the rails can be laid in the first half of 2010.