EAST CHINA ELECTRIC POWER
2010年
5期
710-711
,共2页
姚刚%刘速飞%姚艳%刘丰
姚剛%劉速飛%姚豔%劉豐
요강%류속비%요염%류봉
实时负荷%PI/SCADA系统%电网规划
實時負荷%PI/SCADA繫統%電網規劃
실시부하%PI/SCADA계통%전망규화
real-time load%PI/SCADA system%power grid planning
利用现代计算机技术开发了电网规划辅助决策系统,有效地提高了工作效率,确保了电网规划决策的科学性。系统与实时负荷接口的实现,使电网发展可与电网规划互相校验,保持与电网规划同步、协调。
利用現代計算機技術開髮瞭電網規劃輔助決策繫統,有效地提高瞭工作效率,確保瞭電網規劃決策的科學性。繫統與實時負荷接口的實現,使電網髮展可與電網規劃互相校驗,保持與電網規劃同步、協調。
이용현대계산궤기술개발료전망규화보조결책계통,유효지제고료공작효솔,학보료전망규화결책적과학성。계통여실시부하접구적실현,사전망발전가여전망규화호상교험,보지여전망규화동보、협조。
The assistant decision system for power grid planning was developed based on modern computer technology,which effectively improved the working efficiency and ensured the scientific nature of the power grid planning decision.Through realizing the interface between the system and the real-time load,the power grid development could be mutually verified with the power grid planning and could be kept synchronization and coordination with the power grid planning.