LG地区X井是中国石油天然气集团公司布置在该构造上的一口风险探井,存在井深、岩石可钻性差,参考资料较少,钻遇异常高压可能性大,井底温度高,纵向上地层压力系统多,硫化氢含量普遍较高等钻井工程风险.针对深井安全钻井的难点,开展了气体钻井、螺杆带PDC钻头、防斜钻井等综合配套技术试验研究,并提出如下建议:①在井下出现油、气、水显示,已危及钻井安全,或供气量不够、井底沉砂超过20 m,接单根困难以及有阻卡现象,应及时转换为钻井液钻井;②采用空气锤不仅能够保证良好的井身质量,而且能保持较高的机械钻速,应继续在(φ)311.2 mm井段中推广应用钟摆、满眼钻具防斜技术;③加强总结,不断完善LG构造上的深井、超深井安全快速钻井配套技术.
LG地區X井是中國石油天然氣集糰公司佈置在該構造上的一口風險探井,存在井深、巖石可鑽性差,參攷資料較少,鑽遇異常高壓可能性大,井底溫度高,縱嚮上地層壓力繫統多,硫化氫含量普遍較高等鑽井工程風險.針對深井安全鑽井的難點,開展瞭氣體鑽井、螺桿帶PDC鑽頭、防斜鑽井等綜閤配套技術試驗研究,併提齣如下建議:①在井下齣現油、氣、水顯示,已危及鑽井安全,或供氣量不夠、井底沉砂超過20 m,接單根睏難以及有阻卡現象,應及時轉換為鑽井液鑽井;②採用空氣錘不僅能夠保證良好的井身質量,而且能保持較高的機械鑽速,應繼續在(φ)311.2 mm井段中推廣應用鐘襬、滿眼鑽具防斜技術;③加彊總結,不斷完善LG構造上的深井、超深井安全快速鑽井配套技術.
LG지구X정시중국석유천연기집단공사포치재해구조상적일구풍험탐정,존재정심、암석가찬성차,삼고자료교소,찬우이상고압가능성대,정저온도고,종향상지층압력계통다,류화경함량보편교고등찬정공정풍험.침대심정안전찬정적난점,개전료기체찬정、라간대PDC찬두、방사찬정등종합배투기술시험연구,병제출여하건의:①재정하출현유、기、수현시,이위급찬정안전,혹공기량불구、정저침사초과20 m,접단근곤난이급유조잡현상,응급시전환위찬정액찬정;②채용공기추불부능구보증량호적정신질량,이차능보지교고적궤계찬속,응계속재(φ)311.2 mm정단중추엄응용종파、만안찬구방사기술;③가강총결,불단완선LG구조상적심정、초심정안전쾌속찬정배투기술.
The well LG-1 is the first key exploratory well at LG structure. It is featured by great well depth, poor rock drillability, inadequate reference data, high possibility of abnormally high pressure formations, high bottom-hole temperature, multiple formation pressure systems along the vertical direction, and high H_2S content. To overcome the problems challenging the safe deep drilling, comprehensive research and tests have been done on gas drilling, compound drilling with PDM and PDC bits, and deflection-preventive drilling. Some suggestions have been provided as follows: a. during gas drilling, if there is oil, gas or water show, which is endangering the drilling safety, or if the gas rate is insufficient, causing a thickness of over 20 m of the settled sands at the bottomhole and resulting in difficult connection or sticking, gas drilling should be turned to mud drilling; b. the air hammer can not only ensure high wellbore quality, but help maintain a high ROP, and the pendulum and packed hole techniques should also be kept in service at the 311.2 mm-diameter hole section; c. lessons and experiences should be learned continuously to improve the safe and fast drilling technology for deep and ultra-deep wells at the LG structure.