顶拱肋梁%破坏原因分析
頂拱肋樑%破壞原因分析
정공륵량%파배원인분석
top arch rib beam%destruction causes analysis
着重分析镜泊湖地下厂房顶拱肋梁运行30多年来存在的缺陷以及造成缺陷的原因,通过对原型观测资料的分析,获得了对类似工程具有参考价值的几点建议.
著重分析鏡泊湖地下廠房頂拱肋樑運行30多年來存在的缺陷以及造成缺陷的原因,通過對原型觀測資料的分析,穫得瞭對類似工程具有參攷價值的幾點建議.
착중분석경박호지하엄방정공륵량운행30다년래존재적결함이급조성결함적원인,통과대원형관측자료적분석,획득료대유사공정구유삼고개치적궤점건의.
This text draw the emphasize on analyzing the defects of top arch rib beam in Jingbo lakes' underground powerhouse whieh started operation 30 years ago, as well as the eauses reasons. Based on analyzing the original observation data, several sug-gestions of reference value for similar projects were advanced.