山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
4期
246-247
,共2页
住宅%电气安装工程%质量控制
住宅%電氣安裝工程%質量控製
주택%전기안장공정%질량공제
dwelling%electrical installation engineering%quality control
针对住宅电气安装工程质量控制进行了探讨,从施工流程入手,分别阐述了施工前,施工中各分部工序的质量控制措施及注意事项,指出在电气施工中应严格按照规范施工,做好技术交底,并协调好交叉工序,以保证施工质量。
針對住宅電氣安裝工程質量控製進行瞭探討,從施工流程入手,分彆闡述瞭施工前,施工中各分部工序的質量控製措施及註意事項,指齣在電氣施工中應嚴格按照規範施工,做好技術交底,併協調好交扠工序,以保證施工質量。
침대주택전기안장공정질량공제진행료탐토,종시공류정입수,분별천술료시공전,시공중각분부공서적질량공제조시급주의사항,지출재전기시공중응엄격안조규범시공,주호기술교저,병협조호교차공서,이보증시공질량。
This paper inquires quality control of residential electrical installation engineering. To begin with construction procedure, it respectively describes quality control measures and matters needing attention before and during construction, such as being strict in electrical construction according to norms, doing well in technological disclosure, and coordinating intersected procedures, so as to guarantee construction quality.