中国电力
中國電力
중국전력
ELECTRIC POWER
2009年
11期
52-56
,共5页
配电网规划%风险度评价%云模型%改进蚁群算法
配電網規劃%風險度評價%雲模型%改進蟻群算法
배전망규화%풍험도평개%운모형%개진의군산법
distribution network planning%risk assessment%cloud model%improved ant colony algorithm
提出一种基于风险度评价和改进蚁群算法的配电网灵活规划方法.将规划年的预测负荷、电价及导线价格等参数的变化由原来的离散状态转变为多场景区间,从而将电网规划中的单一不确定性问题转化为多个确定性问题.在求解不确定性问题时,提出一种基于云模型的改进蚁群算法,通过定性关联规则推理对蚁群算法中信息素参数ρ和信息素强度Q进行定性控制和动态选取,根据算法进化情况自适应更新支路信息素,有效克服了传统蚁群算法易陷入局部最优解及收敛速度慢的问题.应用改进蚁群算法,依次获得各个场景的规划方案,并以风险度最小为标准确定鲁棒性最优的规划方案,实现电网的灵活规划.算例分析验证了所提方法的有效性.
提齣一種基于風險度評價和改進蟻群算法的配電網靈活規劃方法.將規劃年的預測負荷、電價及導線價格等參數的變化由原來的離散狀態轉變為多場景區間,從而將電網規劃中的單一不確定性問題轉化為多箇確定性問題.在求解不確定性問題時,提齣一種基于雲模型的改進蟻群算法,通過定性關聯規則推理對蟻群算法中信息素參數ρ和信息素彊度Q進行定性控製和動態選取,根據算法進化情況自適應更新支路信息素,有效剋服瞭傳統蟻群算法易陷入跼部最優解及收斂速度慢的問題.應用改進蟻群算法,依次穫得各箇場景的規劃方案,併以風險度最小為標準確定魯棒性最優的規劃方案,實現電網的靈活規劃.算例分析驗證瞭所提方法的有效性.
제출일충기우풍험도평개화개진의군산법적배전망령활규화방법.장규화년적예측부하、전개급도선개격등삼수적변화유원래적리산상태전변위다장경구간,종이장전망규화중적단일불학정성문제전화위다개학정성문제.재구해불학정성문제시,제출일충기우운모형적개진의군산법,통과정성관련규칙추리대의군산법중신식소삼수ρ화신식소강도Q진행정성공제화동태선취,근거산법진화정황자괄응경신지로신식소,유효극복료전통의군산법역함입국부최우해급수렴속도만적문제.응용개진의군산법,의차획득각개장경적규화방안,병이풍험도최소위표준학정로봉성최우적규화방안,실현전망적령활규화.산례분석험증료소제방법적유효성.
An "algorithm of power distribution network flexible planning was proposed based on risk assessment and improved ant colony algorithm. The parameters of object year, such as load, electrovalence, lead price were changed from discrete state to a section of multi-scenario. The uncertainty problem of planning was changed into several confirmed problems. An adaptive ant colony algorithm based on cloud model was presented. The parameters ρ and Q of ant colony algorithm are qualitatively controlled and dynamically selected by employing the uncertain qualitative association rule inference based on cloud modeL The pheromone of branches is adaptive updated according to the process of the algorithm. The adaptive algorithm overcomes the main disadvantage of being inclined to local convergence and slow convergence speed of traditional ant colony algorithm. The adaptive algorithm is applied in confirmed distribution network structure planning. The scheme of each scenario was obtained and the optimum robust planning scheme was made with considering the minimum cost expectation scheme. Then the distribution network flexible planning could be realized. The instance of the paper indicates the method is feasible.