石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2009年
6期
56-60,63
,共6页
齐月魁%单桂栋%曲庆利%刘长军%王晓梅
齊月魁%單桂棟%麯慶利%劉長軍%王曉梅
제월괴%단계동%곡경리%류장군%왕효매
水平井筛管完井%快速钻塞%盲板%压胀裸眼封隔器%反循环酸洗与胀封管柱
水平井篩管完井%快速鑽塞%盲闆%壓脹裸眼封隔器%反循環痠洗與脹封管柱
수평정사관완정%쾌속찬새%맹판%압창라안봉격기%반순배산세여창봉관주
horizontal screen pipe completion%fast plud-drilling%blind ram%open-hole packer%cleanup acid with inverse circula-tion and inflate packer string
目前水平井上部固井+下部筛管完井工艺及工具不完善,完井过程中所使用的常规盲板钻塞时间长,影响了整个作业周期.介绍了一种水平井筛管完井工艺,对快速钻塞工艺管柱、水泥充填树脂盲板、压胀裸眼封隔器、反循环酸洗与胀封管柱的工作原理、结构、技术参数进行了阐述,给出了现场施工工艺及应用效果.通过应用一种可快速钻除的盲板以及其他配套工具来实现水平井迅速完井,解决了常规完井钻塞缓慢、施工周期长的问题.该工艺的成功应用对缩短完井周期、节约作业成本有重要作用.
目前水平井上部固井+下部篩管完井工藝及工具不完善,完井過程中所使用的常規盲闆鑽塞時間長,影響瞭整箇作業週期.介紹瞭一種水平井篩管完井工藝,對快速鑽塞工藝管柱、水泥充填樹脂盲闆、壓脹裸眼封隔器、反循環痠洗與脹封管柱的工作原理、結構、技術參數進行瞭闡述,給齣瞭現場施工工藝及應用效果.通過應用一種可快速鑽除的盲闆以及其他配套工具來實現水平井迅速完井,解決瞭常規完井鑽塞緩慢、施工週期長的問題.該工藝的成功應用對縮短完井週期、節約作業成本有重要作用.
목전수평정상부고정+하부사관완정공예급공구불완선,완정과정중소사용적상규맹판찬새시간장,영향료정개작업주기.개소료일충수평정사관완정공예,대쾌속찬새공예관주、수니충전수지맹판、압창라안봉격기、반순배산세여창봉관주적공작원리、결구、기술삼수진행료천술,급출료현장시공공예급응용효과.통과응용일충가쾌속찬제적맹판이급기타배투공구래실현수평정신속완정,해결료상규완정찬새완만、시공주기장적문제.해공예적성공응용대축단완정주기、절약작업성본유중요작용.
Now the technology and tools are not well developed for upper cementing and lower screen completion of horizontal wells. During the process of completion, plug-drilling takes a long time using convential blank cover. In this paper, a horizontal screen piple completion technology is introduced, the working principle, structure, and technical parameters of the fast plug-drilling pipe string, the cement-filled resin blind ram, the open-hole packer, the cleanup acid with inverse circulation and inflate packer string are elaborated, and field application process and results are presented. A kind of blind ram that can be used for fast drilling is used to fulfill fast comple-tion of horizontal wells. This helps solve the problem of slow plug-drilling of conventional completion and a long cycle of construction. The successful application of the technology plays an important role in shortening completion cycle and saving operation cost.