EXPLORATION ENGINEERING (DRILLING & TUNNELING)
2013年
7期
29-32
,共4页
填方滑坡%排水%注浆加固%抗滑桩%微型组合抗滑桩
填方滑坡%排水%註漿加固%抗滑樁%微型組閤抗滑樁
전방활파%배수%주장가고%항활장%미형조합항활장
fill landslide%drainage%grouting reinforcement%anti-slide pile%micro combination anti-slide pile
某天然气井场坐落于一填方平台,由于土体填方施工时未达固结,致使该天然气井场3次发生滑坡灾害,并3次进行治理。采用的治理方案依次为地面排水+注浆加固+抗滑桩、抗滑桩+挡土墙加固、微型组合抗滑桩。在阐述该天然气井场填方滑坡特点的基础上,对治理工程及其效果进行了分析。
某天然氣井場坐落于一填方平檯,由于土體填方施工時未達固結,緻使該天然氣井場3次髮生滑坡災害,併3次進行治理。採用的治理方案依次為地麵排水+註漿加固+抗滑樁、抗滑樁+擋土牆加固、微型組閤抗滑樁。在闡述該天然氣井場填方滑坡特點的基礎上,對治理工程及其效果進行瞭分析。
모천연기정장좌락우일전방평태,유우토체전방시공시미체고결,치사해천연기정장3차발생활파재해,병3차진행치리。채용적치리방안의차위지면배수+주장가고+항활장、항활장+당토장가고、미형조합항활장。재천술해천연기정장전방활파특점적기출상,대치리공정급기효과진행료분석。
A gas well site is located in a fill platform, the landslide disaster occurred for 3 times, because the soil filling was not consolidated when the construction was started.The treatment solutions for 3 landslides were ground drainage +grouting reinforcement +anti-slide pile, the anti-slide pile +retaining wall reinforcement and micro combination anti-slide pile.Based on the characteristics of landslide in the natural gas well fill, the treatment engineering and the effects are analyzed, and the action effects of micro combination anti-slide pile technology used in this landslide treatment is especially analyzed.