企业技术开发(学术版)
企業技術開髮(學術版)
기업기술개발(학술판)
TECHNOLOGICAL DEVELOPMENT OF ENTERPRISE
2013年
11期
19-21
,共3页
砂子坡隧道%进口左侧%古滑坡体%加固
砂子坡隧道%進口左側%古滑坡體%加固
사자파수도%진구좌측%고활파체%가고
Shazipo Tunnel%left side of the entrance%ancient landslide mass%strengthening
砂子坡隧道进口左侧处于古滑坡体中,进洞十分困难。文章在工程地质勘探的基础上,对砂子坡隧道进口左侧边坡进洞加固方案进行了研究,可为施工提供技术指导。
砂子坡隧道進口左側處于古滑坡體中,進洞十分睏難。文章在工程地質勘探的基礎上,對砂子坡隧道進口左側邊坡進洞加固方案進行瞭研究,可為施工提供技術指導。
사자파수도진구좌측처우고활파체중,진동십분곤난。문장재공정지질감탐적기출상,대사자파수도진구좌측변파진동가고방안진행료연구,가위시공제공기술지도。
The left side of the entrance of Shazipo Tunnel lies in an ancient landslide, it is very difficult to dig the entrance of it. Re-search of strengthening schedule of slope in the left side of the entrance of Shazipo tunnel is made in this paper based on the engineering geological prospecting.It will provide some technical guidance for tunnel construction.